PMO WEST
2007 at a Glance
Environmental Progress at Alameda Point
Thomas L. Macchiarella
Alameda BRAC Environmental Coordinator
December 6, 2007
BRAC
Completed CERCLA Documentation pn~o ~sT
• Final Site Investigations: 3 SIs, 86 acres
• Final Remedial Investigation Workplans:
1 Operable Unit, 25 acres
• Final Remedial Investigations: 5Sites, 487
acres
1
2007 Calendar Year Deliverables BBC
sorted by type -- RI HMO ~T
Sites 20,24: Draft RI Report, Feb
Site 32: Draft Final RI Report, Mar
Site 32, Final RI Report, Apr
Site 31: Draft Final Sail RI, Jul
Sites 20,24: Draft Final RI Report, Jul
Site 31: Final Soil RI Report, Aug
Sites 20,24: Final RI Report, Aug
Site 34: Draft RI Report, Sep
Site 30, Draft RI Addendum, Nov
Site 35, Draft Final RIIFS Report, Mar
Site 35: Final RIIFS Report, Apr
Site 2: Draft f=inal FS Report, Apr
Site 32, Draft Final FS Report, Jun
Site 24, Draft FS, Nov
Site 35, Draft Final RIIFS Report, Mar
Site 35. Fnal RIIFS Report, Apr
Ol~2C: Final Workplan Supplemental RI Sampling,
May
2007 Calendar Year deliverables ~~C
sorted by type -- FS p~0 WEST
Site 2: Draft Final FS Report, Apr
Site 32, Draft Final FS Report, Jun
Site 24, Draft FS, Nov
Site 35, Draft Final RIIFS Report, Mar
Site 35: Final R1IFS Report, Apr
3
2007 Calendar Year Deliverables BBC
sorted by type -- TCRA ~o w~T
Sites 1,2,32: Draft Final TCRA Removal Action Workplan, Jan
Sites 1,2,32: Draft TCRA Final Workplan, Feb
Sites 1,2,32: Final TCRA Action Memo, Feb
Sites 5,10: Draft TCRA Workplan, May
Sites 5,1~: Draft Action Memo, May
Sites 1,2,32; Final TCRA Workplan Addendum ~Fxploratory Trenching,Aug
Sites 1,2,32: Final TCRA Workplan, Mar
2007 Calendar Year deliverables BBC
sorted by type -- Sampling p~0 WEST
Site 14: Draft Dalagap Sampling Workplan, Jan
Site 28: Draft Datagap Sampling Workplan, Jan
Site 14: Draft Final Datagap Sampling Plan, Apr
Site 26: Draft Final Datagap Sampling Plan, Apr
Site 14: Final Datagap Sampling Workplan, Jun
Site 28, Final Workplan far Datagaps Sampling, Jun
Site 2fi: Final Datagap Sampling Report, Jul
OU1:Draft Final Datagap Sampling Workplan, Jul
Site 13: Draf# Workplan far SCAPs, Jul
OU1: Final Datagap Sampling Workplan, Aug
OU 2AI2B: Datagap Sampling Workplan, Sep
DU2A126: Final Datagaps Workplan, Oct
Site 13, Final Workplan SCADS, Nav
OU2B: Draft Tech Memo Subslab Soilgas, Aug
Sites 1, 2, 32: Radiological Survey Charactenzatian Report, Sep
5
2007 Calendar Year deliverables BBC
sorted by type Remedial Design & Pilot test pro w~sT
Site 2E: Preliminary Remedial DesignlRemedialAction Workplan, Aug
Site 17, Preliminary Remedial Design, Oct
Fact Sheet to area residents -- 0U-5 Pilot Test
Site 26, Draft Pilot Test Workplan, Sep
Site 26, Final Pilot lest Workpian
Summary of 2887 Documents
FY~d~ :~:.
+~4;
~~~~~~ ~~~~~~2aQ .::
.. "..
.
~-
.. r.~;
4
~~
E
~ . --
t ..
_,.,..~. ~
e ,~
T t i D
o a ocs L
~ Y~ ~ b 0~ !rr~ T ~ fA t
r ;~
~
~~~-,
;
~
' ,
;
.
.
;,.
.
r, ~
~ ; " ~t v/u~ ~ ~i ' ~
:f'' rr'i ~;,~:
Prima Docs
:~ , ~3 '„~ t .JwE~
°7~ , ,F ~~ . , w~,~,~j~~f.~
,r , ~ n~
~,.
1 t' ~ ..17 ~`~i tt
~#
BRA
(PMO WEST)
~~
7
BRAC
Key "Cleanup" Items (continued) PMO WEST
• Site 4: The ERH treatment duration was 9
months, with completion in July 2007. Greater
than 150 pounds of COCs were removed and
groundwater concentrations were reduced from
400,000 µg/L to less than 1,400 µg/L.
• Site 4: In July and September 2007, bench testing
of nano-scale Zero Valent Iron (ZVI) was
completed. Pilot testing will commence in
January 2008.
~RA~
FY07 Planned Major Milestones Pao WEST
REPRIIV'r
• Finalize 7 R4Ds. We did 6.
• Finalize 3 RIs, 2 or 3 FSes. We did 4 RIs for 5 sites. We
did 1 FS, 2~~ is imminent.
• 2 Action Memos. We did 1, The 2~d is imminent.
• 2 Final TCRA Workplans. We did 1. The Zn~ is nearly
finalized. We also did 1 amendment trenching},
• Draft Remedial Action Workplans for 2 sites ~ 1 will
become Final}. We did 2 Drafts.
• Final Remedial Designs for 2 Sites. We did 2 Drafts.
• Data gathering events at multiple sites. Yes indeed.
• 3 more Sis. We did 3.
9
Site Management Plan 2008 BBC
(continued) p~0 WE3T
• About 60 primary docs planned for calendar
2008
• Noteworthy 2008 planned milestones:
- Initiate remedial action at Site 17
-Final OU-2A FS
-Final ROD, Sites 1 & 27
-Proposed Plan/Public Meetings for
• Sites 31, 20, 35
11