Loading...
2008-01-02 ARRA 4-A HandoutBRAC PMO WEST 2007 at a Glance Environmental Progress at Alameda Point Thomas L. Macchiarella Alameda BRAC Environmental Coordinator December 6, 2007 BRAC Completed CERCLA Documentation pn~o ~sT • Final Site Investigations: 3 SIs, 86 acres • Final Remedial Investigation Workplans: 1 Operable Unit, 25 acres • Final Remedial Investigations: 5Sites, 487 acres 1 2007 Calendar Year Deliverables BBC sorted by type -- RI HMO ~T Sites 20,24: Draft RI Report, Feb Site 32: Draft Final RI Report, Mar Site 32, Final RI Report, Apr Site 31: Draft Final Sail RI, Jul Sites 20,24: Draft Final RI Report, Jul Site 31: Final Soil RI Report, Aug Sites 20,24: Final RI Report, Aug Site 34: Draft RI Report, Sep Site 30, Draft RI Addendum, Nov Site 35, Draft Final RIIFS Report, Mar Site 35: Final RIIFS Report, Apr Site 2: Draft f=inal FS Report, Apr Site 32, Draft Final FS Report, Jun Site 24, Draft FS, Nov Site 35, Draft Final RIIFS Report, Mar Site 35. Fnal RIIFS Report, Apr Ol~2C: Final Workplan Supplemental RI Sampling, May 2007 Calendar Year deliverables ~~C sorted by type -- FS p~0 WEST Site 2: Draft Final FS Report, Apr Site 32, Draft Final FS Report, Jun Site 24, Draft FS, Nov Site 35, Draft Final RIIFS Report, Mar Site 35: Final R1IFS Report, Apr 3 2007 Calendar Year Deliverables BBC sorted by type -- TCRA ~o w~T Sites 1,2,32: Draft Final TCRA Removal Action Workplan, Jan Sites 1,2,32: Draft TCRA Final Workplan, Feb Sites 1,2,32: Final TCRA Action Memo, Feb Sites 5,10: Draft TCRA Workplan, May Sites 5,1~: Draft Action Memo, May Sites 1,2,32; Final TCRA Workplan Addendum ~Fxploratory Trenching,Aug Sites 1,2,32: Final TCRA Workplan, Mar 2007 Calendar Year deliverables BBC sorted by type -- Sampling p~0 WEST Site 14: Draft Dalagap Sampling Workplan, Jan Site 28: Draft Datagap Sampling Workplan, Jan Site 14: Draft Final Datagap Sampling Plan, Apr Site 26: Draft Final Datagap Sampling Plan, Apr Site 14: Final Datagap Sampling Workplan, Jun Site 28, Final Workplan far Datagaps Sampling, Jun Site 2fi: Final Datagap Sampling Report, Jul OU1:Draft Final Datagap Sampling Workplan, Jul Site 13: Draf# Workplan far SCAPs, Jul OU1: Final Datagap Sampling Workplan, Aug OU 2AI2B: Datagap Sampling Workplan, Sep DU2A126: Final Datagaps Workplan, Oct Site 13, Final Workplan SCADS, Nav OU2B: Draft Tech Memo Subslab Soilgas, Aug Sites 1, 2, 32: Radiological Survey Charactenzatian Report, Sep 5 2007 Calendar Year deliverables BBC sorted by type Remedial Design & Pilot test pro w~sT Site 2E: Preliminary Remedial DesignlRemedialAction Workplan, Aug Site 17, Preliminary Remedial Design, Oct Fact Sheet to area residents -- 0U-5 Pilot Test Site 26, Draft Pilot Test Workplan, Sep Site 26, Final Pilot lest Workpian Summary of 2887 Documents FY~d~ :~:. +~4; ~~~~~~ ~~~~~~2aQ .:: .. ".. . ~- .. r.~; 4 ~~ E ~ . -- t .. _,.,..~. ~ e ,~ T t i D o a ocs L ~ Y~ ~ b 0~ !rr~ T ~ fA t r ;~ ~ ~~~-, ; ~ ' , ; . . ;,. . r, ~ ~ ; " ~t v/u~ ~ ~i ' ~ :f'' rr'i ~;,~: Prima Docs :~ , ~3 '„~ t .JwE~ °7~ , ,F ~~ . , w~,~,~j~~f.~ ,r , ~ n~ ~,. 1 t' ~ ..17 ~`~i tt ~# BRA (PMO WEST) ~~ 7 BRAC Key "Cleanup" Items (continued) PMO WEST • Site 4: The ERH treatment duration was 9 months, with completion in July 2007. Greater than 150 pounds of COCs were removed and groundwater concentrations were reduced from 400,000 µg/L to less than 1,400 µg/L. • Site 4: In July and September 2007, bench testing of nano-scale Zero Valent Iron (ZVI) was completed. Pilot testing will commence in January 2008. ~RA~ FY07 Planned Major Milestones Pao WEST REPRIIV'r • Finalize 7 R4Ds. We did 6. • Finalize 3 RIs, 2 or 3 FSes. We did 4 RIs for 5 sites. We did 1 FS, 2~~ is imminent. • 2 Action Memos. We did 1, The 2~d is imminent. • 2 Final TCRA Workplans. We did 1. The Zn~ is nearly finalized. We also did 1 amendment trenching}, • Draft Remedial Action Workplans for 2 sites ~ 1 will become Final}. We did 2 Drafts. • Final Remedial Designs for 2 Sites. We did 2 Drafts. • Data gathering events at multiple sites. Yes indeed. • 3 more Sis. We did 3. 9 Site Management Plan 2008 BBC (continued) p~0 WE3T • About 60 primary docs planned for calendar 2008 • Noteworthy 2008 planned milestones: - Initiate remedial action at Site 17 -Final OU-2A FS -Final ROD, Sites 1 & 27 -Proposed Plan/Public Meetings for • Sites 31, 20, 35 11