2005-11-01 Regular CC MinutesMINUTES OF THE REGULAR CITY COUNCIL MEETING
TUESDAY- - NOVEMBER 1, 2005- -7:30 P.M.
Mayor Johnson convened the regular meeting at 7:46 p.m.
ROLL CALL - Present: Councilmembers Daysog, deHaan, Gilmore,
Matarrese, and Mayor Johnson - 5.
Absent: None.
AGENDA CHANGES
(05 -516) Councilmember deHaan stated that he thought the Public
Hearing to accept new, revised preliminary designs for the Cineplex
and a 352 -space parking structure [paragraph no. 05 -524] and the
Public Hearing to consider an Appeal of the Planning Board's
approval of Use Permits [paragraph no. 05 -525] should be heard in
reverse order.
PROCLAMATIONS, SPECIAL ORDERS OF THE DAY AND ANNOUNCEMENTS
(05 -517) Proclamation honoring the developers of the Marketplace,
and declaring November 1, 2005 as Donna Layburn, Paul Hossack, and
Gerald Mackey Appreciation Day.
Mayor Johnson read and presented the proclamation to Donna Layburn
and Gerald Mackey, developers of the Marketplace.
Donna Layburn thanked the Council for the proclamation and support.
Councilmember Matarrese thanked the developers for persevering.
Councilmember deHaan stated that he appreciates moving forward with
the developer's vision.
Vice Mayor Gilmore stated that the Marketplace is a great place to
shop; tenants have created a wonderful synergy; owners are
friendly, outgoing, and helpful.
Valerie Ruma, Alameda, stated that she is a fan of the marketplace.
(05 -518) Library project update.
The Project Manager gave a brief project update.
Mayor Johnson requested that the Project Manager alert the Council
on available options if the project is still under budget.
Regular Meeting
Alameda City Council 1
November 1, 2005
Councilmember deHaan inquired whether items removed through value
engineering were prioritized, to which the Project Manager
responded in the negative.
Councilmember deHaan requested that items removed through value
engineering be prioritized by cost and gain.
Councilmember Matarrese stated direction was given to review
longevity versus spending; analysis should be given to saving
$26,000 today and spending $60,000 for restroom rehabilitation in
the future because durable countertops were not installed.
The Project Manager stated there was significant discussion on the
countertop issues; countertop prices would be provided to the
Council.
Councilmember Matarrese requested a report on long -term projections
for replacement costs.
CONSENT CALENDAR
Councilmember deHaan moved approval of the Consent Calendar.
Vice Mayor Gilmore seconded the motion, which carried by unanimous
voice vote - 5.
[Items so enacted or adopted are indicated by an asterisk preceding
the paragraph number.]
( *05 -519) Minutes of the Special and Regular City Council Meetings
held on October 18, 2005. Approved.
( *05 -520) Ratified bills in the amount of $2,861,380.74.
( *05 -521) Recommendation to accept the Quarterly Investment Report
for the period ending September 30, 2005. Accepted.
( *05 -522) Recommendation to authorize the City Manager to pay Bay
Ship & Yacht Company $134,598.19 for facility upgrades to the Main
Street Ferry Terminal. Accepted.
( *05 -523) Resolution No.
Reflect Current Positions
of Alameda's Conflict of
No. 13726." Adopted.
13906, "Amending Resolution No. 9460 to
and Entities to be Included in the City
Interest Code and Rescinding Resolution
Regular Meeting
Alameda City Council 2
November 1, 2005
REGULAR AGENDA ITEMS
(05 -524) Public Hearing to accept new, revised preliminary designs
for the cineplex and a 352 -space parking structure at the corner of
Oak Street and Central Avenue, within the C -C T (Community
Commercial Theater) Zoning District.
The Development Services Director gave a brief presentation on the
project.
Mr. Towey with Komorous - Towey Architects gave a Power Point
presentation.
Councilmember deHaan stated there are seven parking levels;
inquired whether the elevator tower reached up to the seventh
level.
The Architect responded in the negative; stated the previous and
current designs are the same; the seventh level was extended to
make up for some lost spaces.
Councilmember deHaan inquired whether the highest peak would be the
elevator tower and whether the roof level was now 70 feet.
The Architect responded that the top of the elevator tower was the
highest point.
Councilmember deHaan stated that the canopies look industrial;
inquired whether other options were considered.
The Architect responded that the industrial nature of the canopies
could be valid, depending on execution; the historical period being
evaluated had very flat and thin awnings; many were roll out
awnings; the intention is to keep the metal very flat and thin as
opposed to having a sloping top; the corrugated metal would not be
visible; the canopies could be executed to look finished.
Councilmember deHaan inquired whether there was another design
which could pull back the 20 inch protrusion.
The Architect responded that the previous design studied what would
occur if the protrusion had to be pulled back; twenty -five seats
and a few feet off one of the screen's sides would be lost; his
charge was to work with the approved floor plans.
Mayor Johnson opened the public portion of the hearing.
Proponents (In favor of the design): Pauline Kelley, Alameda; Pete
Regular Meeting
Alameda City Council 3
November 1, 2005
Halberstadt, Alameda (read a list of 33 people in favor of the
design); Chuck Millar, Alameda; Marilyn Schumacher, Alameda; Sherri
Stieg, Alameda; Harry Hartman, Alameda; Michael John Torrey,
Alameda.
Opponents (Not in favor of the design): Anthony Mark, Oakland;
Birgitt Evans, Alameda Architectural Preservation Society (RAPS);
Jack Boeger, Alameda; Christopher Buckley, RAPS; Richard Rutter,
RAPS; Irene Dieter, Alameda (submitted comments); Valerie Ruma,
Alameda; Victoria Ashley, Alameda; Vern Marsh, Alameda; Robert
Gavrich, Alameda (submitted comments); Jay Levine, Alameda
(submitted comments); Jon Spangler, Alameda; Ron Schaeffer, CMFA
(submitted comments); Kevin Fredrick, Alameda; David Miller,
Alameda; Dave Kerwin, Alameda.
There be no further speakers, Mayor Johnson closed the public
portion of the hearing.
Councilmember Daysog stated that the project design was light years
ahead of the previous design.
Councilmember Matarrese concurred with Councilmember Daysog; stated
Council direction was followed to make the facade less modern,
match the architectural character of the existing theater, and
accommodate the project; the project should be accepted.
Councilmember deHaan stated that he is comfortable with the design;
the design addresses some of the AAPS's concerns and project
continuity; he appreciates that time was taken to review the
design.
Vice Mayor Gilmore stated that she is particularly pleased with the
parking garage; the staff and Architect did an excellent job of
following Council direction; thanked RAPS for input; stated the
parking garage is an excellent design.
Mayor Johnson stated that she appreciates the staff's and
Architect's work; improvements are outstanding; the project should
move forward.
Councilmember deHaan stated he is concerned with the 70 -foot high
parking structure, which would be even with the marquee; stated
Mariner Square's new boat storage facility is 50 -feet tall; Alameda
Point Hangers 41 and 39 are 45 -feet tall; massing is a concern.
Councilmember Daysog stated that he voted against the matter
several months ago on very narrow grounds, which still stand; he is
concerned that the City is not getting the best business deal out
Regular Meeting
Alameda City Council 4
November 1, 2005
of the project; the rent on the historic theater amounts to 30
cents per square foot when the market rate is around $1.50 to $1.80
per square foot; charging 60 cents would amount to millions of
dollars over time; the Council cannot treat fiscal issues lightly;
there is pent up demand for a movie theater in Alameda; he is
concerned with project redevelopment; a lot of public dollars are
being put into the project; $9 million is being put into the
historic theater and more is being put into the parking garage and
cineplex; public investment would be paid back through future tax
increments; redevelopment needs to add value and not just recoup
investments; projects need to generate sales tax, more property
taxes, and more revenues; investments are being made that are not
just redevelopment dollars, but dollars that previously went to
other taxing public entities; the promise of redevelopment is not
just to revitalize blighted areas but also to pay back entities;
there would not be associated redevelopment costs if there was a
better business deal; the project is more of a street and sidewalk
public works project, where recouping of public funds is not
expected; he is glad that the historic theater would be restored;
he is concerned with getting the best possible rent for the City; a
beautiful project should never trump bottom line considerations; he
will stick to his guns regarding the fiscal aspects of the project.
Mayor Johnson stated that the Council voted on the business plan in
May; Councilmember Daysog voted for the business plan, which
included the square footage rental; the historic Alameda theater
project is not intended to be strictly a business deal, but also a
historic renovation project; a new cineplex could be built for less
money; the historic theater is being significantly restored; she
would hope that a second and third phase restoration could be done;
saving the building first is necessary.
Councilmember Daysog stated that he voted for the Disposition and
Development Agreement (DDA) in May; a DDA is never consummated
until all the land use approvals are put in place per the Municipal
Code; financial feasibility was referenced when the Downtown Vision
Plan was adopted.
Councilmember Matarrese moved approval of the revised design of the
cineplex and the parking structure.
Vice Mayor Gilmore seconded the motion, which carried by the
following voice vote: Ayes: Councilmembers Gilmore and Matarrese
and Mayor Johnson - 3. Noes: Councilmember Daysog - 1. Abstentions:
Councilmember deHaan - 1.
(05 -525) Public Hearing to consider an Appeal of the Planning
Board's approval of Use Permits for: a) multi - screen theatre, live
Regular Meeting
Alameda City Council 5
November 1, 2005
theatre, and public assembly use in the C -C T district pursuant to
AMC Subsection 30 -4.22; b) fifty eight (58') foot building height
for the Cineplex pursuant to AMC Subsection 30- 4.9A.g.2; and c)
extended hours of operation until 3:00 a.m. for the theatre
pursuant to AMC Subsection 30- 4.9A.c.1(a) for up to 24 days per
year. The site is located at 2305 -2317 Central Avenue, within the
C -C T (Community Commercial Theatre Combining) District.
Applicants: Kyle Conner, Alameda Entertainment Associates, LP.
Appellants: Ani Dimusheva and Robert Gavrich; and
(05 -525A) Resolution No. 13907, "Upholding the Planning Board's
Approval of Use Permit UP05 -0018 for: A) Multi - Screen Theater, Live
Theater, and Public Assembly Use in the C -C T District Pursuant to
AMC Subsection 30 -4.22; B) Fifty Eight Foot (58') Building Height
for the Cineplex Pursuant to AMC Subsection 30 -4.9A. G -2; and (C)
Extended Hours of Operation until 3:00 A.M. for 24 Days per Year
for the Theater Pursuant to AMC Subsection 30- 4.9A.C.1(A) for
Occasional Special Events and Screenings, with a condition that an
analysis of late -night screening be conducted after 12 events or a
year, whichever comes first." Adopted.
The Supervising Planner gave a brief presentation on the project.
Mayor Johnson opened the public portion of the hearing.
Opponents (Not in favor of the project): Jenny Curtis; Citizens for
a Megaplex -Free Alameda (CMFA) (submitted comments) ; Valerie Ruma,
CMFA (submitted comments) ; Ani Dimusheva, Appellant; Alice Ray,
CMFA (submitted comments); Kristi Koenen, CMFA; Andy Crockett, CMFA
(submitted comments) ; Vern Marsh, CMFA; Phyllis Greenwood, CMFA;
Lew Brentano, CMFA (submitted comments); Joe Meylor, CMFA; Robert
Gavrich, Appellant(submitted comments); Paula Rainey, CMFA; Kevin
Fredrick, CMFA; Russell Kirk, CMFA (submitted comments) ; Richard
McClure II, Alameda (not present); Arthur Lipow, Alameda (submitted
letter) ; Deborah Overfield; David Kirwin, Alameda; David Miller,
Alameda; Jon Spangler, Alameda; Gary McAffe, Alameda; Mark Dombeck,
Alameda; Ana Rojas, Alameda; Clyde Serda, Alameda (submitted
comments); Glen Vivion; Susan Battaglia, Alameda; Rosemary McNally,
Alameda (submitted comments) ; William F. Assali, Alameda (not
present); Irene Dieter, Alameda.
Proponents (In favor of the project) : Rich Warner, Alameda; Gail
Wetzork, Alameda; Marilyn Ezzy Ashcraft, Alameda; Cathy Leong,
Alameda; Kevin Leong, Alameda; Fritz Mayer, Alameda; Bruce Reeves,
Alameda (not present) ; Harvey Brook, Alameda; Lars Hanson, Park
Street Business Association (PSBR); Barbara Marchand, Marchand
Associates; Sherri Hansell, Alameda; Mary Amen; Debbie George,
Alameda; Lowell Schneider, (PSBA) ; Blake Brydon, Alameda; Barry
Regular Meeting
Alameda City Council 6
November 1, 2005
Finkelstein, Alameda; Mike Corbitt, Chamber of Commerce Board;
Chuck Carlise; Alameda; Marilyn Schumacher, Alameda (not present);
Robert Doumitt, Alameda (not present) ; Robert McKean, Alameda;
Sherri Stieg, WABA; Walt Jacobs, Chamber of Commerce (not present);
Kyle Conner, Applicant; Harry Hartman, Alameda (not present); Nancy
Brandt, Alameda; Michael Torrey, Alameda; Frank George, Alameda;
Melody Marr, Chamber of Commerce (read list of 14 people in favor
of the project); Duane Watson, Lee Auto Supply.
There being no further speakers, Mayor Johnson closed the public
portion of the hearing.
Councilmember Daysog stated that people can always agree to
disagree but should not be disagreeable; Councilmembers he has
worked with since 1996 have all had the interest of the community
in mind; the community must move forward regardless of tonight's
decision; he has always focused on the dollars and cents of a
project; he has reservations with the proposed alternative; other
cities are doing other things; El Cerrito has purchased a historic
theater and is contracting with a company to run the theater;
Orinda is working with a non - profit group to preserve its historic
theater; he will support the Appeal because of the dollars and
cents issue; 30 cents per square foot would generate $3 million
versus 60 cents per square foot generating $6 million over the life
of a twenty year project; stated he respects the other
Councilmembers' opinions.
Councilmember deHaan stated seven downtown parking sights were
reviewed in October 2002; the sites were narrowed down to three:
the Elk's Club, Longs, and Bank of America; the report showing that
Video Maniacs was one of the sites is in error; inquired when the
Video Maniacs site came into play.
The Development Services Director responded that Video Maniacs was
considered as a site in a parking analysis prior to October 2002;
the opportunity was shifted to Long's; there was additional
dialogue combining the two sites; the shift went back to the Video
Maniacs site when Long's no longer wanted to work with the City.
Councilmember deHaan stated that Video Maniacs was identified as a
parking structure before the cineplex review; inquired whether five
screens were ever considered.
The Development Services Director responded there were a number of
proposals that had a combination of multiple screens; five screens
in the historic theater were never considered.
Councilmember deHaan stated that he was referring to five screens
Regular Meeting
Alameda City Council 7
November 1, 2005
in the cineplex.
The Development Services Director stated screen size and number of
seats were discussed; internal evaluations included reviewing
something smaller.
Councilmember deHaan inquired whether five screens were
recommended.
The Development Services Director responded that staff concluded
that five screens would not be viable as competition continued to
increase in the area.
Councilmember deHaan inquired whether the viability of a five -
screen theater was understood.
The Development Services Director responded different product and
configurations were reviewed.
Councilmember deHaan inquired whether five screens were considered
and recommended by staff.
The Development Services Director responded moving forward on the
matter was considered.
Councilmember deHaan stated that Page 7 of the staff report
addresses parking garage availability; the bottom line notes that
the parking garage and available parking would still have an extra
capacity of about 335, the day after the parking structure was
built; inquired whether there was a change in October 2005.
The Development Services Director responded in the affirmative.
Councilmember deHaan stated that Page 28 of the study notes there
would be additional parking; he is concerned about using off - street
parking; inquired whether off - street private parking could be used.
The Development Services Director responded that the referenced
study includes the Library; the studies are not comparable; there
was some accommodation for off - street parking within the
calculation of the use of the Library; off - street parking has not
been calculated for the parking structure, cineplex or historic
theater.
Councilmember deHaan inquired why private parking was included.
The Development Services Director responded there are a number of
private parking lots that are not owned by the City, such as the
Regular Meeting
Alameda City Council 8
November 1, 2005
Bank of America lot that make up part of the mix; the parking lots
become part of the available population when office workers go
home; parking supply is not just public parking.
Councilmember deHaan stated there is no entitlement to private
parking.
Councilmember Daysog moved that the Regular Meeting be continued to
past midnight.
Councilmember Matarrese seconded the motion, which carried by
unanimous voice vote - 5.
Councilmember deHaan inquired whether private parking could be used
if there was an agreement with the owners.
The Development Services Director responded that covenants are not
sought from owners for parking access.
Councilmember deHaan stated that a parking structure would not be
needed according to information provided in a 2000 study; the study
noted that 204 spaces were available on Saturday evenings; inquired
how impacts from the Masonic Temple, high school, Kaufman
Auditorium and Elks Club were calculated.
The Development Services Director responded that the analysis did
not assume anything other than normal activity; seasonable events
overwork a parking supply and change the normal scenario; the
analysis reviews typical peak times and does not focus on the
unusual.
Councilmember deHaan inquired why the 70 -foot parking structure was
not included in the September 29, 2005 staff report.
The Development Services Director responded the report was prior to
the new project.
Councilmember deHaan inquired whether the 70 -foot parking structure
was equivalent to the Alameda Theater sign and the Twin Tower
spiral.
The Development Services Director responded the 70 -foot parking
structure was the interior of the mechanical system elevator
penthouse on the parking structure only; stated the Oak Street
facade of the parking structure has now dropped to 48 feet; the
final ramp roof of the sixth story goes up to just below 70 feet.
Regular Meeting
Alameda City Council 9
November 1, 2005
Councilmember deHaan inquired whether there were always seven
levels to which the Development Services Director responded the
sixth story roof parking was always in place.
Councilmember deHaan stated the setbacks were done well; the cost
per square foot increases with higher levels; inquired whether the
soil conditions have been reviewed.
The Development Services Director responded that the site has sandy
soil.
The Redevelopment Manager stated that a professional geotechnical
consultant prepared a soil report; the loose sand would need to be
removed; compacted, new soil would have to be brought in or the
grade below could be used to add some additional spaces to make up
for the setback.
Councilmember deHaan inquired whether exterior architectural
treatment would add to the cost.
The Development Services Director responded there are some cost
savings with the revised design; the goal was to have the parking
garage structure cost under or at budget; removing the brick was a
savings; providing long, side openings would save on ventilation.
Councilmember deHaan inquired whether there was a cost estimate for
the parking structure.
The Development Services Director responded that there was a
ballpark estimate from the Architect; the Architect feels the
project was close, if not under budget; removing ventilation and
sprinkling would save money.
Councilmember deHaan stated the October 2002 cost estimate for 269
spaces was $5.4 million.
The Development Services stated the estimate was the cost per
parking space without land acquisition, relocation, and all soft
costs for design and engineering; hard construction costs per space
was approximately $18,000 to $19,000.
Councilmember deHaan stated the report shows a cost of $16,000 per
space a few years ago.
The Development Services Director stated that San Jose had a 1999
cost estimate for $15,000 per space which ended up costing $34,000
per space by the time the structure was built four years later;
Regular Meeting
Alameda City Council 10
November 1, 2005
costs are difficult to estimate without construction documents.
Councilmember deHaan inquired whether the cost estimate was $16
million in 2002 -2003.
The Development Services Director responded that $10.5 was bonded
for the parking structure and $7.5 million was bonded for the
historic theater.
Councilmember deHaan stated the November 2004 estimate was $24.7
million and now there was an estimate of $26.8 million.
The Development Services Director stated that the construction
contingency was gone; adding a 15% construction contingency was
requested for the historic theater.
Councilmember deHaan inquired whether $28 million would consume all
the dollars for the project, to which the Development Services
Director responded very close.
Councilmember deHaan stated that the project might have to be value
engineered.
The Development Services Director responded that there is no place
to value engineer the historic theater.
Councilmember Matarrese requested a recap of the Planning Board
conditions regarding 3:00 am late night screenings.
The Development Services Director stated that the two primary
conditions are: 1) the operator must submit an operation plan which
the Police Department and the City reviews for appropriateness, and
2) the Use Permit would be reviewed by the Planning Board (after a
year) to decide whether additional conditions are needed.
The Redevelopment Manager stated that the 3:00 am use is restricted
to 24 times per year in the bottom four screens.
Councilmember Matarrese inquired whether there would only be first -
run movies at the late night screenings.
The Development Services Director responded in the affirmative;
stated the requirement was part of the Development Agreement.
Councilmember deHaan inquired whether there would be contract
Police overtime when the theater is in operation past midnight, to
which the Development Services Director responded in the
affirmative.
Regular Meeting
Alameda City Council 1 1
November 1, 2005
Councilmember deHaan inquired whether the Police Department would
be notified a week before the special event.
The Development Services Director responded the Police Department
would be notified a couple of weeks before the special event.
Councilmember deHaan inquired whether special showings would be in
the bigger or smaller theater.
The Development Services Director responded special showings could
be a combination of both; the intent is to have all the big
blockbusters start in the bigger theater.
Councilmember deHaan inquired whether there was a caveat to review
the Use Permit after a year, to which the Development Services
Director responded in the affirmative.
Councilmember deHaan inquired how often the Developer ran late
night movies.
The Developer responded that the new Harry Potter movie was being
released Thursday at midnight; Star Wars and Serenity ran at 12:01
a.m.; approximately six movies have been shown past midnight this
year.
Councilmember deHaan inquired whether lowering the number of late
night movies would be acceptable.
Mayor Johnson stated that the Planning Board had a very thorough
discussion on midnight showings; there should be flexibility.
Councilmember deHaan stated there was no Planning Board resolution
regarding cueing.
The Development Services Director stated she spoke to the Police
Chief regarding the matter and concluded that nobody believes
cueing would occur.
The City Attorney stated that there is a section in the Resolution
regarding cueing; there are five conditions on blockbuster releases
and special venues.
Councilmember deHaan inquired
overtime for cueing, to which
responded in the affirmative.
whether there would be contract
the Development Services Director
Councilmember deHaan inquired why a Public Works and Police
Regular Meeting
Alameda City Council 12
November 1, 2005
Department review was requested.
The Development Services Director responded the Public Works review
was requested because of street and sidewalk issues; the Police
Department review was requested for insight; special requests would
be discussed among all department heads.
Vice Mayor Gilmore inquired whether the zoning district allows up
to 60 feet with the granting of the Use Permit.
The Development Services Director responded in the affirmative;
stated the parking structure is exempt.
Vice Mayor Gilmore inquired whether only the cineplex was being
discussed, to which the Development Services Director responded in
the affirmative.
Councilmember Matarrese stated that comments at the Planning Board
meeting and tonight's meeting are no different; the Planning Board
took diligence in reviewing the Municipal Code for the cineplex
height requirements and did a credible job in reviewing extending
hours past midnight; stated he has no problem as long as the hours
are monitored.
Councilmember Matarrese moved adoption of the resolution upholding
the Planning Board's approval with a condition that there be a
monthly analysis of late -night screenings and a review after 12
events or a year, whichever comes first.
The Development Services Director stated that there would be a
master review after 12 events.
Mayor Johnson inquired whether the Planning Board would review the
matter, to which Councilmember Matarrese responded in the
affirmative.
Vice Mayor Gilmore seconded the motion, which carried by the
following voice vote: Ayes - Vice Mayor Gilmore, Councilmember
Matarrese, and Mayor Johnson - 3. Noes: Councilmember Daysog - 1.
Abstentions: Councilmember deHaan - 1.
ORAL COMMUNICATIONS, NON- AGENDA
None.
COUNCIL COMMUNICATIONS
(05 -526) Status of the Infrastructure Improvement Project /Plan,
Regular Meeting
Alameda City Council 13
November 1, 2005
including scope, issues, timelines and questions.
Councilmember Daysog requested that the Council forward
infrastructure plan ideas to the staff prior to the matter being on
the agenda in December; suggested community oversight be
established; requested future discussions on how streets are
prioritized for crack sealing treatment.
Mayor Johnson stated she would not want to have the infrastructure
report delayed in order to review options; the Council should
review what other cities do; she was very disappointed when the
Council learned that the infrastructure spending was cut nearly
500, which made making the reserve appear to be false; stated the
reserve is not false; deferred maintenance occurred; stated there
is crack sealing all over the City; a decision was made not to do
crack sealing; the Council needs more information on what is
prioritized and the affects of the decisions; a long catch -up game
is required due to the cuts.
Councilmember Daysog requested some level of discussion about an
oversight committee that would inform the Council on issues.
Mayor Johnson stated there should be a discussion on available
options and goals.
Councilmember deHaan inquired when the infrastructure report would
be brought to the Council, to which the City Manager responded
December.
Councilmember deHaan inquired whether park deterioration would be
included in the report.
The City Manager responded the report includes sidewalks, streets,
street tree planning, field maintenance, facility maintenance,
sewers, and storm drains.
(05 -527) Vice Mayor Gilmore stated that she attended the
Association of Bay Area Governments (ABAG) Conference in Oakland
last week; the main topic of conversation was affordable housing;
there was a strong recognition that individuals are being priced
out of the Bay Area market; the 20 -30 year old group stated housing
was a real problem; unfortunately the language at the conference
was harsh on both sides and was not a good coming together to
exchange ideas.
(05 -528) Councilmember deHaan stated that the Chamber of Commerce
had a briefing on the Ninth Avenue project in conjunction with the
Port of Oakland for 3,500 to 4,000 homes; there is continual build
Regular Meeting
Alameda City Council 14
November 1, 2005
out on the other side of the Estuary; the City is in litigation
which restricts fulfilling commitments; expressing the City's
concerns regarding constraints are important.
Councilmember Daysog stated that he previously requested a summary
report on Oakland developments that need to be reviewed; requested
a follow up to his request.
ADJOURNMENT
There being no further business, Mayor Johnson adjourned the
regular meeting at 12:37 a.m.
Respectfully submitted,
Lara Weisiger
City Clerk
The agenda for this meeting was posted in accordance with the Brown
Act.
Regular Meeting
Alameda City Council 15
November 1, 2005