Loading...
2008-09-10 ARRA PacketAGENDA Special Meeting of the Governing Body of the Alameda Reuse and Redevelopment Authority Alameda City Hall Council Chamber, Room 390 2263 Santa Clara Avenue Alameda, CA 94501 Wednesday, September 10, 2008 Meeting will begin at 7:00 p.m. 1. ROLL CALL, 2. CONSENT CALENDAR Consent Calendar items are considered routine and will be enacted, approved or adopted by one motion unless a request for removal for discussion or explanation is received tram the Board or a me of the public. 2 -A. Approve the minutes of the Special. Joint Meeting of the City Council, ARRA, and CIC of August 19, 2008. 3. REGULAR AGENDA. ITEMS 3-A. Authorize PM Realty Group to Enter: into a Conti -act with. St. Francis Electric for Pier 2 Electrical Upgrades at Alameda Point for a contract not to exceed 1,344,744. 3 -B. .Alameda Point Update Presentation. of the Draft Development Concept. 4, ORAL REPORTS 4 -.A. Oral report from Member Matarrese, Restoration Advisory Board (RAB) representative. RAB Comment Letter Regarding Installation Remediation Site I 5. (ORAL COMMUNICATIONS NON AGENDA. (PUBLIC COMMENT) (Any person.. may address the governing body in regard to any matter over which the governing body has jurisdiction that is not on the agenda.) 6. COMMUNICATIONS FROM THE GOVERNING BODY 7. ADJOURNMENT This meeting will be cablecast live on channel 15. Dotes Sign language interpreters will be available on request. Please contact the ARR.A Secretary at 749 -5800 at least 72 hours before the meeting to request an interpreter. f Accessible seating for persons with disabilities (including those using wheelchairs) is available. Minutes of the meeting are available in enlarged print. Audio tapes of the meeting are available for review at the A.R.R.A. offices upon request. Present: Chair: Beverly Johnson Boardmember Doug deHaan Boardmember Frank Matarrese Boardmember Marie Gilmore Vice Chair Lena Tarn 2• CONSENT CA 2 -A. Approve the minutes of the Special Meeting of July 1, 2005 and the Special Joint City Counci l and Community Improvement Commission Meeting held on August 5, 2008. 2 -B. Authorize Negotiation and Execution of a Sublease for Rockwall 'Nine Company, Inc. at Alameda Point. 2 -C. Authorize Negotiation and Execution of a Sublease for Auctions by the Bay, Inc. at Alameda Point. 2 -D. Authorize the Executive Director to Enter a Contract, through PM Realty Croup, with. General. Construction Company to Dredge the Alameda Point Channel and Turning Basin in an. Amount Not to Exceed 2,586,675. .Approval of the Consent Calendar was motioned by Member Tara, seconded. by Member deHaan and passed by the following voice votes: Ayes: 5, Noes; 0, Abstentions: 0. Member Gilmore abstained from approving the minutes of the Special Joint City Council and Community Improvement Commission Meeting held on August 5, 20088 3. REGULAR AGENDA ITEMS 3 -A. Recommendation to concur with the Non Finding Summary of Terms and Conditions for a transfer of the Exclusive Negotiation Agreement with SCC Alameda Point LLC to a New Entity with D.L. Shaw or transfer of an Ownership Interest in the SCC Alameda Point LLC to D.E. Shaw; and Recommendation to authorize the City Mahager/EAxecutive Director to negotiate a Second Amendment to the Exclusive Negotiation Agreement with SCC Alameda Point LLC. Debbie Potter Base Reuse and Community Development Manager, discussed Suncal's request for authorization to secure a financial partner to complete it's obligations under the ENA. Approval to secure a financial partner is in Alameda's sole discretion, and authorization must be granted by the CC, ARRA, and CIC. This request was originally scheduled for consideration in June. At that time, staff had prepared a report that identified a number of key provisions that should be part of any partnership agreement, Including that SunCa.l should retain day -to -day management responsibilities, continue to have equity stake in the project, and no removal of Suncal as a partner except for cause; and that there should be a commitment of funds sufficient to fund the ENA obligations and activities. Another key provision i.s that SunCal as master developer and managing investor, should retain key decision making authority. Lastly, there is a key provision prohibiting cross collateralization. and cross default, essentially protecting Alameda Point from being put at risk based on the activity or performance of other S unCal properties. The executed term sheet between Suncal and D.E. Shaw provides for some, but not all, of core provisions: D.E. Shaw cannot remove Suncal as the managing investor for one year, Suncal. must maintain a $1.5 million. stake in the pooled fund, and D.E. Shaw expects to invest $10 million in the ENA entitlement process. However, D.E. Shaw remains the ultimate decision maker over the project budget, business plan and other major decisions. In addition, Sun.Cal can be removed for cause or no cause after: one year as the term sheet is presently drafted. Given the changed nature of the project and that the term sheet does not include all core provisions, staff recommends that Alameda consider directing the City Manager to negotiate a second amendment to the ENA that would allow us to manage some of the risk the City might be exposed to by our inability to retain. some of these core provisions in the tern. sheet. Amending the ENA in several. areas should include: requiring that the completion of the conveyance term sheet with the Navy, that is now part of special. legislation, be a mandatory milestone; and secondly, that we tighten up and revise some of the tim.efraanes that are currently contained in the ENA that don't reflect the project going to a ballot, most likely in the land plan. that Suncal's pursuing, and that we loot{ at an. outside expiration date of the term sheet so that we have an ability to evaluate where we are one year from now and see how the project has changed and the progress that has been made. The recommendation is that Alameda concur with the provisions of the term sheet and that the operating agreement come back to the City, ARRA, and CIC in. closed session for final approval of the assignment and transfer, and that the ENA be amended and returned to the ARRA Board at the same time for approval. There were several speakers including Michael Kruger, who spore in support of Suncal and its aggressive plans to address the climate protection issues. Richard Banger spoke about his main concern regarding the 2"" amendment and the decision making powers of D.E. Shaw. He stated the importance of, once a 2"" amendment is drafted, that a well publicized community meeting take place for the public to offer comments. Helen Sause, of HOMES executive board, spoke on behalf of Suncal, urging the City to make it possible for them to continue their work and expressed HOMES support of Suncal, stating that the City is best serviced if the Navy doesn't auction the land. Doug Biggs of APC also supports the efforts of Suncal, expressing how very innovative, engaging and open they are when. negotiating with APC. Elizabeth. Krase asked why the term sheet is not public record, and expressed concerns regarding the possibility of the construction of buildings 12 to 20 stories high (as discussed at the Aug. 7 Community Workshop on the USS Hornet) and that there was no solution for transportation or traffic discussed and it is not realistic. Chair Johnson thanked the speakers and clarified that the Alameda Point redevelopment Project, itself, was not before the ARRA tonight, and that the request by Suncal for authorization to secure a financial. partner was the item before the Board. Vice Chair Tarn asked the City Attorney or staff to respond to Ms. Krase question regarding the term.. sheet being public. Terri Highsmith, City Attorney, explained that the term sheet is a confidential real property document. It is not finalized and still being negotiated, so it is appropriate to be viewed in closed session. once the project is completed and every action has been taken to finalize it, any real property document discussed in closed session will become public record. Vice Chair Tam continued to discuss assurance that Suncal and D.E. Shaw are committed to each other with regard to the ENA and would like to see the agreement reflected in the ENA with regard to the financial plan. Chair Tarn. described an analogy about finding a different mortgage company to re- finance your home, that they are looking at the fine print. She supports directing staff to ensure the ENA reflects the commitment to have SunCal as master developer and that the timel.i.ne comports with timelines that are expected. Member deHaan was concerned and asked whether SunCal would be willing to continue, or had a fall -back plan, in the event a non Measure A compliant plan did not pass. Pat Keliher, SunCal's Alameda Point Project manager, replied that indeed they have a fall -back plan and have discussed Measure A compliant plans internally. He stressed that SunCal would not just walk away from the project and would continue in the process for the long term Member Gilmore thanked SunCal and D.E. Shaw for their transparency and honesty with their public presentations and comments to the Board in closed session. She expressed that the Board will be looking very closely at the operating agreement. Maintaining Suncal as the master developer during the ENA process is important because that is the expectation of the community, and that SunCal remain the master developer until. it is mutually decided the project doesn't work or is not feasible. we made a commitment to SunCal, not to a third party. Member Gilmore stated that SunCal. has been straightforward and that the desire is to move forward together with the appropriate protection in place for the community. Member Matarrese discussed bringing the ENA back to the Board, as its purpose is to drive us to a Development Agreement. He stressed that the 2 nd amendment to the ENA should include provisions that protect the city. He motioned for the following amendments: 1) that we can terminate the ENA for reasons other than for cause, either illegal activity or other malfeasance; 2) the timeline should be capped to remove the current flexibility which was termed as an "automatic extension" and should be adjusted to meet current progress; and 3) insulate Alameda Point from cross default. The 2 nd amendment should be brought back to the AR.RA for review with the public and then finalization. Member deHaan asked for clarification on the relationship between D.E. Shaw and Lehman Brothers. Debbie Potter explained that SunCal had anticipated they would self finance, but had initially identified Lehman Bros. as a possible financial partner. SunCal will continue to self fund until Alameda approves the operating agreement and 2 nd amendment to the ENA. Member deHaan wanted to know where D.E. Shaw was receiving its funds. Ms. Potter explained that D.E. Shaw is a typical, hedge fund with various investors and $40—$50 billion in funds available. David Brandt, Deputy Executive Director, further explained that D.E. Shaw is a privately held hedge fund, and that the identities of their investors is confidential, we know the volumes, but we don't know individual investors. Member Gilmore expressed a main concern about cross default, urging that we make sure that in the event something was to happen to another of Suncal's project, the ripple effect stops before it reaches Alameda. Member Matarrese summarized and reiterated his motion stated earlier. Member Tam seconded the notion and it was passed by the following voice votes: Ayes 5, Noes 0, Abstentions 00 3 -B. Oral report from Member Matarrese, Restoration Advisory Board (RAB) representative. Member Matarrese did not attend the RAB meeting, as it conflicted with the Community Meeting, which he attended. He made one comment regarding an 8/13 front -page Chronicle article about the US .Army giving the Fort Ord reuse authority 3300 acres and providing $100 million for rernedi ati on. He asked if this was true. David Brandt affirmed it is true. Member Matarrese stated that we should talk to our elected officials on federal level and ask them why we can't get fay- Less acreage and the money for clean -up. Chair Johnson questioned whether $100 million was enough for the clean up. Mr. Brandt responded that the Environmental Protection Agency (EPA) and the Department of Toxic Substances Control (DTSQ believe that it is sufficient, and that the Army is still liable for that waste. Member deHaan confirmed that once that Land is transferred to the Fort Ord reuse it was their plan to be dissolved. Chair Johnson discussed that this privatized clean up was what the Navy had proposed at one point, except that we're paying for it, and that the Army operates differently than Navy. 7. ADJOURNM Meeting was adjourned at 8:43 p.m. by Chair Johnson. Respectfully submitted, ci Irma Ol i dden AR.RA Secretary Alameda Reuse and Redevelopment Authority Interoffice Memorandum 3 September la, 2008 To: Honorable Chair and Members of the Alameda Reuse and Redevelopment Authority FROM* Debra Kurita, Executive Director SUBJ: Authorize PM Realty Group to Enter into a Contract with St. Francis Electric for Pies: 2 El ectrical Upgrades at Alameda Point for a Conti -act Not to Exceed $1,344,744 BACKGROUND In April 2006, the Alameda Reuse and Redevelopment Authority (ARRA) approved a 20 -year sublease with the Maritime Administration (MARAD). As part of the technical requirements in support of the lease, the ARRA is obligated to deliver reliable electrical. service to the ships. The electrical. system. on pier 2 is old, unreliable and does not comply with the current standard provided throughout Alameda. In January 2007, the ARRA approved the design work for the electrical upgrade project in order to be ready to proceed once the Alameda Power and Telecom st pplied transformers arrived. In July 2007, staff bought the $1.7 million project to the ARRA Governing Board for approval.. The ARRA directed staff to revise the project in. order to reduce the total costs. DISCUSSION Staff worked closely with Alameda Power and Telecom (AP&T) to understand the condition of the pier electrical. system. to determine if the existing system could be maintained for the remainder of the lease or if there were other strategies that could be implemented to provide power and reduce the project cost. AP &T confirmed that the system needed to be upgraded and moved above ground to prevent water infiltration. However:, AP &T also informed staff that market changes had recently resulted in a lower cost for a similar AP&T project and suggested that ARRA re -bid the project to see if the cost could be lowered through that process. The project was re -bid and advertised in the Alameda Journal for two weeks. Pour companies attended the bidders conference, and three bids were received; Clyde G. S teagal 1, Inc. $1,290,1.31 St. Francis Electric $1,278,760 Edward W. Scott Electric $1,590,000 With 5% contingency, and an add -on alternate for concrete x -ray, and an independent testing agency for structural scope, the contract amount is not to exceed $1,344,774. The new project cost is approximately $400,000 less than the original cost. The project construction period is estimated at 200 days. Honorable Chair and Members of the September 10, 2008 .Alameda Reuse and Redevelopment Authority Page 2 of 2 BUDGE` CONS IDERATIONIFINANCIAL IMPACT The FY2008 -09 approved ARRA budget included $1,700,000 for the Pier 2 electrical upgrade. There is no impact to the General Fund. R ECOMMENDATION Authorize PM Realty Group to enter into a contract with St. Francis Electric for Pier 2 electrical upgrades at Alameda Point for a contract not to exceed $1,344,774. Res gctfully submitted, Leslie ifte Development Services Director By: Nanette Banks Finance Adi ninistration Manager City of Alameda Alameda Rettse and Redevelopment Authority September 10, 2008 To: Honorable Chair and Members of the Alameda Reuse and Redevelopment Authority FROM: Debra Kurita Ex.ecuti.ve Director r F E: Alameda Point Update Presentation. of the Draft Development Conce t BACKGROUND On July 18, 2007, the Alameda Reuse and Redevelopment Authority (ARRA), Community Improvement Commission (CIC) and City Council approved an Exclusive Negotiation Agreement (ENA) with SunCal Alameda Point LLC (SunCal) for the redevelopment of Alameda Point. The 24- nzon.th. ENA established key performance milestones, provided for reimbursement of ARRA staff and third party costs, identified activities to be completed by third party entities, and specified key personnel assigned to the project. The ENA was amended in March. 2008 to provide more time to complete two tasks: preparation of the Development Concept and related documents, and preparation of the draft master plan. In addition, SunCal. was required to deposit $350,000 a quarter, and spend $117,000 a month, for consultant costs to ensure progress on developing the required documents. The Development Concept and related documents, including a business plan, infrastructure plan, draft update of the Sports Complex Master Plan, and draft project pro forma, are due on September 19. The draft master plan. is due on Novern.ber 19, 2008. SunCal will. present the draft. Development Concept to the ARRA Board on September 10. DISCUSSION During the initial. 14 -month tern of the ENA, SunCal has held four community meetings and conducted numerous meetings with stakeholders ranging from the Alameda Point Collaborative and business owners located at Alameda Point to members of the Alameda Architectural. Preservation Society and Friends of the Alameda 'wildlife Refuge. SunCal. has made presentations to a variety of community organizations including the Chamber of Commerce and Rotary. SunCal has also continued its due diligence wort{ to better understand and plan for all. the site's constraints and challenges. This due diligence work includes meeting with environmental regulators, the United States Fish and wildlife Service, the United States veterans' Affairs Honorable Chair and Members of the September 10, 2008 Alameda Reuse and Redevelopment Authority Page 2 of 3 Department, and the United States Navy as well as continuing to work with its consultants on traffic and transportation issues, geotechnical and civil. engineering challenges, and historic preservation and land planning concerns. These efforts will culminate with a Development Concept and the related documents to be submitted to the City on September 19. The process began with a community meeting in October 2007 that introduced SunCal to the community and presented the key site constraints. At a meeting in December 2007, SunCal presented two land plans to the community. Based on feedback received at that meeting, SunCal held a community meeting in early August 20Q8 to present its draft land plan for Alameda Point. At a City sponsored Alameda Point Task Force meeting on. August 27, SunCal presented its revised land plan, and members of the Task. Force and the public had an. opportunity to comment on the plan. written comments received after the August 27 meeting are attached to this staff report. The September 10 presentation to the ARRA Board is another opportunity for the public, as well as the ARRA Board, to comment on the plan prior to SunCal finalizing the Development Concept. Following submittal of the Development Concept, SunCal anticipates holding several community meetings on specific topics including historic preservation. These more focused meetings will help SunCal continue to refine its Development Concept and transition it to the required draft master plan. due on November 19. In addition, staff will distribute the Development Concept to City Boards and Commissions with a request that they review and comment on the Development Concept prior to the November 19 due date for the draft master plan. BUDGET CONS IDERA'T`IONIFINANCIAL IMPACT This staff report is for information only and no action is required. Therefore, there is no financial impact on the ARRA and General Fund budgets. RECOMMENDATION Receive public comment and provide feedback on SunCal's draft Development Concept. Honorable Chair and Members of the Alameda Reuse and Redevelopment Authority September 10, 2008 Page 3 of 3 ResJect y submitted,- Yr. r r Les he Little Development Services Director f By: e e tter Base Reuse and Community Development Manager Attachments: I.. Comments from AP 'Mask Force meeting, submitted by John Knox white 2. Letter from Joan Konrad 3. Letter from David Howard ATTACHMENT The Alameda Point Task Force meeting was held Wednesday night, 8127 and was organized in a way that allowed for rambling comments to dominate the meeting, which lead to a number of community members being unable to give their input and a reduction of the agendized "Task. Force Discussion" from 30 minutes to about 8. With this reduced tune, I found myself spouting quick comments that di.dn't require explanation and therefore, I am choosing to pass on those comments here. These are all based on the notes I tools during the meetings discussion. There was a lot of discussion about Suburban vs. Urban development representing a good swath of views. Clearly some portion of Alameda residents consider Alameda a suburb, and therefore recoil. at the idea that suburbs might not be the highest planning use. But Alameda, both historically and currently, is not truly suburban anymore than Berkeley or Albany are. The discussion of Suburban Growth vs. Urban Growth should be clear in this distinction.. Alameda is a city of 75,000 people and it is this fact that gives it its small. town feel. Nobody brags about about Small Suburban feel, because there's a difference. In. the end, the development of Alarneda Point sits in the middle of two areas of influence the city of Alameda and the Bay Area region. And we should be working to meet our obligations for both. Whatever is developed at Alameda Point must have benefits for existing residents. But also, we can't pretend that we don't live in a larger area and that our decisions have zero effect on regional growth patterns. To become myopic is to continue a problem with sprawl. that has been occurring and speeding up for 50 years. Crime came up twice during the discussion, loosely defined and never- attributed, the intimation was that building 5 story condos with stores in them.. will. bring crime (and in. the end hurt property values). But the data on this assertion doesn't back it up. Reviews of the FBI's crime data show no relationship between. density and crime, and in. fact that surburban building patterns tend to have higher crime rates than more dense urban areas with their: street activity and eyes on the street. Historic Preservation was a theme from a couple of speakers. However it's time for the discussion to move beyond "Save every building plus a couple of others" and on to a discussion of what Alameda Point is going to be and how historical. preservation can enhance it. I am concerned, as one of the speakers Wednesday night mentioned, that the current discussion focuses too much on maintaining a military base, rather than a vibrant neighborhood that reflects its past. We need to decide, and I'd suggest that never 15 years of public process already has, whether we want to create a WWII "I- historic Williamsburg" without the reenactors, something that could very well become a big drag on city finances and is probably financi all ysinfeasible due to the infrastructure and clean- up costs. Or are we aiming to create a neighborhood that reflects and complements our existing city with it's mix of historical. and new buildings and that contributes to the both the financial., the amnenities and the character- of our city. If there was one dissappointment in the discussion on Wednesday, and one that should have been addressed during the meeting was the thrice mentioned idea that "the developer" was disrespecting the community by not bringing forth a measure A compliant plan. This was spoken, at a meeting with 15 speakers, by folks who were apparently not at the first SunCal /Alameda Point meeting where such a plan was presented and overwhelmingly rejected. Results that mirror the conversations at APCP's meetings on Alameda Point as well. I'm not suggesting that bringing up Measure A Compliancy should be off the table, but the disrespectful manner- in which some community members presented the issue was disappointing at best. And I want to acknowledge for the sake of clarity that one speaker raised her concerns about the issue while avoiding the "evil developer" speak, it clearly is som.ethi.n.g that the comm.uni.ty should continue to discuss civilly. Lastly, I think. there needs to be a recognition of all the planning that has gone into this process, from the BRAC onward, and that through this public process we have finally arrived at two proposals that meet the goals of the General Plan Amendment for Alameda Point, itself a document nearly a decade in the making. The community has seen two different PDCIMeasure A compliant plans and in both of there they have made their displeasure known (not that they are not dense, but that the design of these plans does not reflect the principles that the community has outlined as important). It's easy to take plans and start tweaking there to meet the specific desires of each small group, but at the end, we need to be careful that we don't end LIP with plans that pay homage to our guiding principles while actively working against those very same principles. one speaker said on Wednesday, "what happens if we do it wrong." And that's always something to be mi.dful of, however-, we also can't bury our heads in. the sand and hope that by doing nothing, or by following 50 years of failing land -use planning that have brought us higher transportation cost, more congestion, less farmland and open space and a strained public in.fratructure, just because we might not do everything perfectly. we have to be careful not to allow our real, and understandable concerns, to force us into bad decisions. Doing nothing, or doing "the same" which in the past 30 yearns has brought more traffic, not less, shouldn't be our neap forward. Lastly, I wanted to say again that while I made comments at the meeting about parts of the project I'd like to see reexamined, and I'm not suggesting that the plan is 100% perfect, SunCal has adapted their- plans to what the community has said after every meeting and Wednesday night was no different. After two years of planning with our past developer and watching plans come forth that did not reflect many of the comments from. the meeting before, I think it should at least be recognized that Peter- Calthor:pe and SunCal are at least responding. Respectfully submitted as comments from the task force meeting, John Knox white loan Konq ATTACHMENT 2 42 I Court A[a mega, Ca i Correia 94501 510 E joankonradOcomca5tnef August 28, 2008 sunCal 909 Marina village Parkway Alameda, CA 94501 Subject- Concerns about Alameda Point Proposed Plan Gentlemen Your proposed goals for plan B, to have a mixed use, sustainable development focused on walking and public transit are commendable. As the plan was presented on .August 7 I have concerns about it achieving those goals in a manner consistent with the City's General Plan. The City of Alameda General Plan., Chapter 9 puts forth seven challenges and issues considered necessary for successful redevelopment of Alameda Point. will your plan meet these cha llenges? -1. Seanless In to o-ra tion ofAlmn eda .Paint Wi th th .pest of the Ci How w ill the seamless integrate be accomplished? The plan seems not to address this issue Mow will the relationship with the Estuary and businesses at the northeast section be handled? will the cyclone fence along Main street be removed? Will the entrance gate structure at the end of Ralph Appezatto Memorial Parkway be retained? How will connections at 'tinker Avenue, Ralph Appezatto Memorial Parkway and Pacific Avenue address the integration? one thought, a neighborhood retail node at Market street and Tinker Avenue would permit an interaction of Alameda Point and Bay Port neighborhoods. 2. ..Fostering a vibrant new nei gbhorhood The General Plan wants to create new and energetic areas, encompassing a var iety of uses." Even though the plan presented was preliminary, it seemed to lack the texture necessary for vibrant neighborhoods. The uses seemed too segregated to be considered mixed use. The layout of the neighborhoods seemed to lack th elements necessary to promote human interaction Will the pedestrian environment be sufficiently pleasing and distances sufficiently short to encourage walking? Will building street fronts in the denser areas be too massive to create a scale compatible with the character of Alameda? I hope the building to street ratio such as is in the live /work neighborhood east of Jack London square and the canyon like walls of the condominium buildings along Bay street in Emeryville are not the types of streetscapes being considered.. 3. Maximizing waterfront accessibility— Thought seems to have been given to access around the seaplane lagoon. I hope thought about access to the Estuary will also be seriously considered. 4. De the automobile and making new development compatible with transportation capacity —The plan B focuses on public transit. I hope future plans will incorporate the necessary pedestrian and bike circulation into the transportation plan. Also, to be successful, the transit plan needs to incorporate the whole island. I hope this is your intent. The elevated individual car transit system was fascinating, but such elevation isolates neighborhoods rather than brings them. together. I wonder if it is appropriate for Alameda Point. 5. Eynstiring economic development Will effort be made to achieve a job/housing balance for the people living in the proposed range of housing types? will densities be sufficient to make retail successful? 6. Creating a -in xed use en vlronmen t —Will there be accommodations for a variety of uses community support services, cultural, religious, civic and recreational within walking distances? 7. Establish neighborhood centers The NASAla -neda C'ommLinity Reuse Plan calls for three neighborhood centers, in the Civic Core, in the Main street Neighborhood west of Main street and in the Inner Harbor. I believe these centers were proposed with the idea of a high proportion of people being within 1 /4 mile of destinations, such as walking children to daycare, walking and biking to schools, shopping. I hope you plan to adjust the development plans to address the conditions of the toxic cleanup. For instance, the Navy is proposing to put a 4 foot layer of soil to cover the contaminated soil at the northwest corner, which is part of the proposed golf course. It probably would be impossible to turn that area into wetlands without running into uncharacterized industrial waste. some in the City had proposed removing the contaminated soil and replacing it with good soil, but apparently that is now unlikely. Alameda Point is such a remarkable location. I wish you every success in tackling the complexities In developing this site. We in Alameda will certainly be the winners if you are successful. Sincerely yours, Joan Konrad Copies: Frank Matarrese, Ann Cook, George Humphreys, Andrew Thomas ATTACHMENT 3 David Howard 928 Taylor Ave Alameda, to 94501 City of Alameda 2203 Santa Clara Ave Alameda, CA 94501 Attn: Alameda Point Task Force Re: Objection to SunCal's proposals for Alameda Point I am dissatisfied with, and stand in opposition to SunCal's proposal to build 0000 housing units at Alameda Paint. Such a proposal would bring from 14,000 to 15,000 people to Alameda Point, at densities roughly twice that of the rest of Alameda, and at a density that closely approaches San Francisco. If SunCal has lower- density Measure A compliant proposals as they asserted before city Council earlier this month, they should bring them forward. Area in Area in Density per Density per Housing square Area i square square square mile square mile Geography Population of land of land area; units miles; Total dater miles a area; Housing area area �a d a e Population units Alameda ci Alameda Coun!y 72,259 31 ,644 22.97 12.17 10.8 6,693 2 0 93 1 San Francisco city, San Francisco Coun 776,7 346,527 231.92 185.22 46.69 16,634 7,421 Alameda Point SunCal Pro osal 776 acres) 14,256 6,000 1 1.20L 9 1.20 11,869 4,987 1 moved my family to Alameda to enjoy the benefits of a low to medium- density suburban community safe neighborhoods, plenty of parks and open space and minimal congestion of people and automobiles. This is a perfectly legitimate way of. life one which many people in this country choose. SunCal's proposals take Alameda in the direction of a high density, congested urban center, something not in keeping with Alameda. SunCal's architect, Peter Calthorpe is known for his dislike of suburbia and his concomittant war an the automobile, even despite the advent of high mileage low emission hybrid automobiles and electric cars. Not everyone wants to, nor should be forced to live in a high density urban environment. I've also done some research on the pie -in -the -sky proposal for a personal rapid transit system for Alameda. Not one PRT system exists in production today to serve a community save for the Morgantown Virginia system built over 30 years ago and which is widely considered not a true PRT system. PRT sounds like more false promises from a developer about mass transit solving congestion that they create with their development. T u, i D v a rd Item 4-A Geor B. Humphre 25 Captains Drive Alameda, CA 94502-6417 Au 22, 2008 Mr. (leor Patrick Brooks, Base Environmental Coordinator Base Reali and Closure Pro Mana Office West 1455 Frazee Road, Suite 900 San Die CA 921.08-43 10 SubJect: Installation Restoration Site I Anal of Trenchin Stud and Deficiencies in Proposed Plan Dear Mr. Brooks-4 This will confirm that the above two documents were hand delivered to y ou at the Au 14, 2008 meetin of the restoration Advisor Board (RAB at Cit Hall West in Alameda, California. The undersi members of the RNB have reviewed and concur with the Information provided and. the views set forth in those documents. We ur y ou to take immediate action to correct the deficiencies in the proposed plan. It is unacceptable that this site has for decades been releasin contaminants into the waters of the Bay�., apparentl with the ac of the re a The proposed plan, if implemented, would leave uncharacterized industrial-t wastes in a condition vulnerable to future releases b seismic darna shoreline erosion, site inundation and incursion b burrowin animals, Sincerel Geor B. Humphre P. E. Communit Co-chair, Restoration Advisor Board i C Y),-f r. IL J UZZ Copies to,. Anna- Cook EPA, John West, RW Dot Lof.strom, DTSC Dr, Peter Russell, Frank Matarrese wila Wa Nastri, EPA w/a Charles Ridenhour, DTSC w/a; -Marc Albeit, Alameda Sun Nv/a Communit RAB members d" Anal of Trenchn Explorator trenches were excavated within the waste cell area (Area 1a of Sitel. The stated objectives of the trenchin were to: a. Verif waste volume estimates. b. Confirm the absence of intact drums The final report(l) on the explorator trenchin was issued on Ma 16, 2008. The findin were as follows: a. The total waste volume within the cells could be between 94,000 and 133,000 cubic y ards c y) This corresponds to a tonna ran of from 141,000 to 200,000 tons. This can be compared to a ran of between 15,000 and 200,000 tons used in the Feasibilit Stud Report (2) b. No intact drums were found c. Althou approximatel 25 of the waste volume had radiation levels above the Nav criterion for removal 6,000 counts per minute the stud states It should not be inferred that the distribution of radiolo contarm*nation in the excavations is consistent throu the volume that was radiolo impacted, nor should it he inferred that this distribution would be consistent throu the site". (Emphasis added It is also noteworth that little or v o n evidence of municip I household wastes was found, onl construction debris (concrete, bricks, pipes, g lass, and wood interspersed in the soil. This ma account for the statement b Mr. Pat Brooks, the Nav Base Environmental Coordinator, durin the aborted tour of Site 1, that a lot of Municipal -wastes were excavated from Site I before construction of the runw He said that he thinks the wastes went to Site 2. This raises q uestions about where the wastes from Site I were deposited in Site 2 and how municipal was could have been transferred without takin alon interspersed toxics and radiolo contamination. If the Nav excavated a substantial volutne of wastes from Site I, and the Nav can document where the occurred (e. under the runwa then the cost of excavation and removal of the remainin wastes would be much less than estimated in the Proposed Plan ($92 million). The Nav still has not ade characterized the contents of the waste cells. Accordin to the Sprin 2007 Basewide Annual Groundwater Monitorin Report IR Site I accepted all of the solid waste g enerated at Alameda Point between 1943 and 1956. Wastes included municipal g arba g e, construction debris, transformers, cleanin solvents, oil/lubricants, ordnance and explosive waste, and radiolo materials such as radium dials and buttons. There was a g olden opportunit to take samples and anal them for toxics durin the explorator trenchin Unfortunatel the Nav was explicit that the were not g oin g to characterize the wastes and that the were onl tr to prove the absence of intact drums a ne objective Even thou the Nav said the weren't going to characterize the wastes, measurements of radioactivity were made during the trenching operations. Figure I -I from the trenching report is attached and has been annotated by the writer. Note that five of the trenches were located relatively close to the walls separating the waste cells. These locations have been circled in the figure. If the locations of these trenches were off only slightly, the trenches may have been cut into the walls between the cells or into the sloping portions of the walls. Thus, it would not be surprising if little or no waste debris were found, Of the eleven trenches, seven showed some excessive radioactive contamination (as indicated on the trenching logs for the respective trenches). perhaps more significan lyr six. of the seven. cells had some radioactively contaminated soli in the excavated soil. Consider the carefully worded conclusion of the trenching report, i.e. that it should not be inferred that the radiological contamination is consistent throughout the waste volume. The word consistent can be taken as meaning uniform or at the carne concentrations throughout. Certainly no one would expect that. What can be reasonabl r concluded 'is f that radioactive contamination of the subsurface matena r is widely scattered throu out the waste cells (but not uniformly). Another observation from Figure 1- I is that the southernmost cell (ire which. trench T-6 was excavated) overlaps or abuts the shoreline. This indicates that e ither wastes from this cell are cun exposed to the or that they could easily be ex osed b minor shoreline erosion in the future. Note also the notation from the `f'-6 trench log that all the excavated soil from this cell was radioactively impacted. One would expect some radioactive contamination of the adjacent beach area.. It is also significant that little or no municipal (household) wastes were found and that Mr. Brooks stated that such wastes were moved to Site 2. The Navy early on relied on the presence o.fmunicipal rather than industrial wastes as Justifying the "presumptive p remedy" of source contai went• It appears that the justification for the "presumptive remedy" has been substantially weakened. From the report and accompanying photographs, it appears that trenching only gent drawn 7 or 8 ft from the surface to the groundwater level. J'here could be wastes buried deeper. It is likely that groundwater and the depth of the bay mud aquitard do not coincide. If the wastes were used, as fill, the wastes could extend down to the original level of the Bay's bottom (i.e. sand or mud), See the attached figure from a ;presentation by the Navy's former Remedial Project Manager, Mr. Rick Weissenborn, that shows the sea. level. 8 It below the surface, but fill going down, to about 25 ft below grade or 17 ft below sea. level. One can reasonably assume that the groundwater level is approximately at, or slightly above, sea level. Aerial photos of the Site 1 waste cells (:from the Feasibility Study) appear to show ponds in the bottom of at least two cells. This indicates that the excavations went substantially below the groundwater levels. I Conclusion The trenching report demonstrates that a substantial fraction of the material buried in the waste cell area is radiologically impacted. Furtb.er, this radiologically_impacted material is widespread and randomly scattered. If this material finds its was to the surface in the future, it will have to be removed from the site because it is radiologically- impacted at levels 6,000 counts per minute) that are unacceptably high. References `'Final Summary of Findings Exploratory Trenches, Revision 1, IR Site 1, Former Naval Air Station., Alameda, Alameda Point, Alameda, California May 15, 2008, prepared. by Tetra. Tech EC, Inc. for BRAG Program Management Office 'Vest. (2) "Draft -Final Feasibility Study Report IR Site 1, 1943 -1956 .Disposal .area, Alameda Point, Alameda, California", fan. 2006, prepared by Bechtel Environmental, Inc. for the BR.0 program Management Office West. (3) "Final Spring 2007, Alameda Basewide annual Groundwater Monitoring Report, Alameda point, Alameda, California Apnl 2008, prepared. by Innovative Technical Solutions, Inc. for BRAC program Management Office "west. 3 C) cl C) cl M� y Mw cs c%4 Ln V) 0 kp 0 Cl LAM til W C13 x "i c� Ic U C-) YY 1 Tize N CH,� C L 0.1S E 1: I 'lMMt-*CH5.,; LEGEND H^r seme. PZAV C= cwrokmlNA,--rlo IR SITE 1 AND 32 BOUNDARIES 4' -vv o- ?R Aov co mTtw t4,& ot q DISPOSAL AREA 13OUNDARY .4 E SEASONAL WETLAND BOUNDARY RMA BOUNDARY to� HAV CiOMF. RAP CCf4TokMW4*Tiot4 i• TRENCH LOCATIONS 1225 CY WWASONAL WETLAND AREA C Y FZAP,-- I lvt PA C MP .50t L (>..&Coo c pt47 DISPOSAL CELL Fi 1 1 TRENCH LOCATIONS IR SITE 32 AND THE SHORELINES OF IR SITES 1 AND ALAMEDA POINT ALAMEDA, CA 300 150 0 300 SCALE IN FEE r 4 f r ti 3 f w k A. t N AV r .r: w.: r 5 9 9 I Big I i I I I I I I I i i 4 4 1 tz .n 2 NI ]or 4% 4it Aw &t3 I Nk it iw Or 41 400 400 Feet SOURCE. PACIFIC AERIAL SURVEYS. 1947L SCALE 1,2,400, Al Al r Feasibilit Stud for IFS Site 1 Fi 2,,2 1947 Historical Aerial Photo Manieda, Cal ifoniia Date: 12116105 Bechtel Environmental, Inc. File No.- 068EI3582 CLEAN 3 Pro gnlm Job No,: 23818-068 Rev No. -I B Deficiencies in the Proposed Plan The Navy's proposed plan for the waste cell (Area 1 a) portion of Site 1. is 4 feet of soil cover and in -situ chemical oxidation for treatment of the volatile organics plume. In November 2006, the community RAB members took the position that excavation of the contaminated portion of the wastes is the appropriate remedy for Area 1 a because the types of waste materials disposed of in the waste cells contained a larger proportion of industrial type (potentially hazardous wastes). The proximity to San Francisco Bay, nearby wetlands, and a high water table, favor excavation and off -site disposal rather than source containment as the preferable alternative. The City took the position. in 2007 that they would not accept transfer of a site containing uncharacterized wastes with a soil. coven Nevertheless, the Navy is proceeding with plans to issue a Record -of- Decision based on the proposed flan. An example of current best practices for military landfills (1) is the excavation and off -site disposal of contaminated material at the 5 -acre former Connaught Military Landfill near Ottawa, Canada.. The site contained mechanical debris from target maintenance, potential unexploded ordnance, paint Cans with paint residue, hospital wastes, broken Concrete and hydrocarbon impacted soil. Off-site disposal costs were reduced by sorting our inert waste materials (concrete, bricks, and steel) and disposing of there on -site. The site was considered environmentally sensitive because of its proximity to the Ottawa River, the City of Ottawa and a bird. sanctuary (an analogous situation to that which exists at sites 1. and Concerns about the Navy's proposed remedy include: a. The source containment as ro osed is inadequate because the sandy soil cover does not meet low- perrneabi.lity standards for hazardous waste landfills and there is no lateral containment. The most southern waste cell apparently overlaps the shoreline and also contains radiologically impacted materials. The Navy has recently said that a rodent barrier and plastic sheet will be added to the top cover, but this has not yet been documented in writing and there aren't any design specifics. An example of an integrated containment system is the Mare Island landfill (2) That application represents integrated. source containment. The RCRA subtitle C cap includes a composite gas vent layer, a geoco.n posite Clay layer, a 60-mil high density polyethylene geomembrane, a geocomposite drainage layer and two feet of cower soil. The 72 -acre landfill site was surrounded by a 7,300 -ft long soil- bentonite slurry wall 25-ft deep and keyed into a naturally- occurr'ng clay layer underlying the site. b. The inteRrity of the to cover may rn be compromised b li uefaction and sand boils (3) as a result of a l.ar e earthquake. There is considerable doubt as to whether the Navy will be able to design, the top cap to resist damage during and/or following a large earthquake in the S. F. Bay area. There is nothing to show that four feet of cover will prevent radioactivity or other toxic materials from being brought to the surface by liquefaction as a result of a major earthquake. The Navy says that the seismic design of the cap will be addressed during the remedial design phase. However, there may be no practical, economic way of preventing such liquefaction. The Navy took the position during the May 2008 RAB meeting that geysers and sand boils will not occur at Site 1. However, there is ample scientific evidence that liquefaction has occurred in poorly consolidated sandy fill areas during both the 1 906 earthquake and the 1989 Lorna Prieta earthquake. During the Lonna Prieta event, liquefaction occurred in the Marina District in San Francisco, at Treasure Island., and along the Cypress freeway in Oakland. Sand boils occurred on Treasure Island during the Loma Prieta seismic event (3) (see the attached photos showing these sand boils). Sand boils and/or geysers represent the conversion of kinetic energy from the seismic shaking into pore (or static) pressure. This pore pressure can cause liquefaction and/or sand boils. whether or not sand bails or geysers result, of course, will depend on the violence and duration. of the earth movement. The sand boils that happened on Treasure Island during the Loma P.rieta event evidence the fact that this can occur. `Fh.e photos indicate that holes 2 to 3 ft in. diameter were created and that sand and subsurface water were ejected from the holes. The Feasibility Study for Site 1 (4) in fact, reported that evidence of liquefaction also was observed at IR Site 1 after the 1989 Loma Prieta earthquake. The Navy's seismic stability study showed 20 ,ft of lateral displacement of the shoreline and 1 1 f 2 ft of vertical displacement in the :over material after a major seismic event. It is important that the bayside stability of Site 1 be maintained both to prevent disposed waste materials from being directly released. Ito S. F. Bay, and to maintain the shoreline integrity of the planned park: and golf course. The earlier study proposed a rock column /soil cement barrier along the bayside of Site 1. The Navy has retreated. /Torn that recommendation and has said that the bayside stability would be achieved by a method to be determined during the remedial design phase. The writer asked, and was assured, that access would be provided to the Site 1 beach area during the July 16, 2008 site tour. However, that area had been fenced off and freshly placed rip rap made it impossible to determine whether shoreline erosion had occurred or whether waste rnate.al had been exposed to the bay. One possible solution to shoreline instability, that has been mentioned by the Navy, is the use of `seismic vents Such vents would consist of perforated pipes fill with gravel,, They would allow .pore pressure, which might cause liquefaction., to be vented to the surface during a r) seismic event. Such venting could a lso cause t oxic materials and radiolog�cally contaminated soil to be released to the surface. c. Ground s uirrels hers and other burrowin animals mu the cover and ha side perimeter. The four -foot cover thickness was selected to provide 2 ft of cover, plus 2 ft to protect against p enetration by ground squirrels. The Navy cited a study in the Site 2 Remedial Investigation that ground squirrels do not dig holes deeper than 2 Feet. The writer's personal observations are that ground squirrels often dig their burrows along banks, on Bay Farm. Island, the squirrels have burrows at the top of the shoreline and have a labyrinth of burrows under the rip rap. These burrows appear to go parallel to the slope for 10 or 15 ft. Also, burrowing owls use the burrows abandoned by ground squirrels and ,hack. rabbits. The owls enlarize and extend the burrows a to a de nth of seven feet Gophers burrow as deep as 6 feet to create nest and food storage chambers d. The trenchin Ly study has shown that radiolo icall im acted soil is idely scattered within the waste cell area. Physical isolation by the top cover may be compromised by a major seismic event and/or penetration. by bu iow ng animals. Maintenance personnel for the proposed shoreline park and golf course( or restored wetlands) will not be equipped with radiation detectors and likely will not be traine in radiological removal or recognize the danger presented by surface releases of soil contaminated by radioactive and toxic mate6als. e. In -situ chemical oxidation. f C may not be effective in treatin the sol vest plume because the '.n ected oxidants may foree the contwninants array from the injection points. Subsurface heterogeneities and preferential flow paths can cause uneven distribution of the oxidant, resulting in untreated pockets of contaminants (7). Because the volatile plume is close to the shoreline, there is a danger that the injection of oxidants will displace the plume into the bay. Also, within. the I CO treatment zone, changes in the n oxidation states and/or H may result in the mobilization of radium and other toxic metals If you have high concentrations of contaminants in a well- defined plume, there is a good opportunity to remove a lot of mass by pumping and treating. Dater, ISCO could be used for polishing. f. The hi ah concentrations exceedin 1 00,000 L of volatile or anic r�omn ounds v C's in the ar oLindwater p lwne indicate that dense non-aqueous p hase liquids I NAPL's) robabl are present tinder the plume. The .proposed .plan (9) for Site I states that DNAf'U s may be present. `these DNAP S have a tendency to .make the bay mud aqu'tard more permeable. Thus, it would be expected that pathways might open up for contaminants to flow into the second water bearing zone. g. 1 "he rad hazard is not whole body radiation h�g rather internal via inhalation and Radium is a bone seeker that can cause 3 bone cancer, leukemia, or lung cancer if it gets into the body. Direct contact with radiologically impacted soil and tox materials b rought to the surface in the f iture poses an inhalation and ingestion hazard to adults and children who might come into contact with such exposed materi The ,600-year half fife of radium h'ngs into question the long -term containment integrity due to seismic activity, shoreline erosion, burrowing animals, and site inundation (global climate change and tsunamis). Note that even without the effects of man -made greenhouse gases, the bay water level has risen 25 to 30 ft over the last 3, years The Navy has sai that it does not have to design for rising sea levels, but it is illogical to design for some physical phenomena and not others. h. be resentation by S unCal on 1, 2008 showed the western ortion of the "northwest territories" being used for wetlands restoration with return to Bay wetlands instead of a Rolf course. If it is planned to excavate portions of Site 1 to create permanent wetlands, this appears incompatible with leaving large quantities of uncharacterized wastes and. radiologica.11y impacted soil in place under a cap. In fact, the creation of an engineered cap in such a situation appears wasteful. There needs to be closer coordination between the Navy, the City of Alameda and the developers regarding cleanup, restoration, and development plans. References 1). Don Plenderlieth, Golder Associates, "Cleanup Duty pg. 41, Mechanical Engineering, Feb. 2008. (2).. "Successful Public Private -Partnership at Former .mare Island Naval Shipyard" 2006, 4 pages, U. S. Department of the Navy. "Treasure Island Reuse plan, Existing Conditions Report :.Volu me 2, Physical Characteristics, B uilding and Infrastructure Conditions, prepared by ROMA Desi Group, Cerbatos Associates Consulting Electrical Engineers, Cervantes Design g n Associates, Don Todd Associates, Manna Consultants, Moffat Nichol .engineers, Olivia Chen Consultants, Inc., Takahashi Consulti Engineers, and rreadwell Rollo Inc., for The Office of Military base Conversion, Planning Department, City Count of San Francisco, and the San Francisco Redevelopment Agency, August 1 995, Second Edition. (4). "Draft -Final Feasibili -ty Study Report, IR Site 1, 1 943 -1 956 Disposal Area, Alameda Point, Alameda., California, Volume 1, Part: A page 2-28, Jan. 00 prepared b �p P y Bechtel Environmental, Inc. for the BRAG Program Management Office West. (5). "The Gull's Call. May/June 2008, article on page 7, "Burrowing Owls on Ba y Farm Island"' by Gerry Long. (6). Alameda Journal, June 13, Zoo article by Nzong Xiong, "Going after Gophers learn how to get rid of the uninvited lawn guests 4 (7)• "Draft Feasibilit Stud IR Site 32, Alwneda Point, Alameda, Califomia", June 2007, prepared b Bechtel Environmental,, Inc, for BR. C Pro Mana Office West, (8 "Geolo Guidebook of the San Francisco Ba Counties", Bulletin 154, State of California, Division of Mines, 1951. (9) September 2006, "Proposed Plan for IR Site 1, 1943-1942 Disposal Area, Fonner NAS Alameda", BRAC Pro Mana Office West. I 5 'Y� a� r• r yrrf r r1�Ma ���..e� Ilkr �fl�i� ^•lye' ey .4. •.S+Y k�'�."v�i'tWy'•�� ti�+`•.w'r,r r r ,.IMa +••'"�+r"i'*3;�';`7''►"r ►yY:` ,s •y F`' '°�je!:i'. ys +r ■r y. f:iw!!.r,_'.1t:::v: ^i^; 'r;.� A a R r .r r •Y�i�r atifi.. yf r. r w i '�'A.�r' r'; s v rwr r' r n%!r�ri ti%.• ,�/M K:r.. Ma r r. o A 1 •r i� 1�i..- ri ,vi/ /yr'^'G. J. ORR lilt! 0 Y: riirF nM�tilj� V!� �'+1�:•\ .;tom �il,►ri, N■ .•p y r.A�:ly! M y M.. -7:MA S k r�ArMrp�1I'lxMl� #''T /.a: •'•'w•rYp�f a. •r i' ;N. A+•i r Rvli•J+E yM� N.� A A V I �a Ry r' r F y•�•rM}r'••r ,y'•,• r r A r I ''r 'yK v: „Y'i� �r WO N r#ir•�fr i� ,r�Ms •AII�/ ra•.' aJi r d w+. rMi41�n!J: .f•s+r. r i' •'•'.��pr.: ?"�;�1w.• .:y'r I.,� ,prr•rH� +'p�;�% bus rw y�,,,,�yi! �wr•� •,'••w►v' .�,p;� ,,,*'F'":�.,' r,,,r''•ti�r ywivi,�r,�., w��� O a ►f sr al'i .,yy C w• .wl�■+■�.vf•r•w.r■#Y` r r' rr r rr.': r y r r.•.•r.•. r• r fiif r •7Vi ii I w w. v yr. J rwr. d *lP�r;. !f'�f J�, r�+•.•. {.M�- �.�•`�,'i 1+rf r w ig F j� r:� r t 1 Vo'��. T.,I!�r' �jK "r•rr, .•ter: :.R.' .l.I .r•�. r'�ti' r•',� i r.:P .j• Ir .i- !/►rr' ♦r r-. :i' /!ri .r,. r.. /r' i f �vr.f•. •.:.•r: 'r';'•r •v: i.�... •I�:. i. ,�.i� v. I.' r wY r .lr ;S /,/f.'• V; irv'vrr yam, ri• i. r •.K.b•�r7►w;r•, "A"""g:�:�ri. •iJ �W4irr ;i ►F.i•. ,y l: �I.. :J.` .J 'R• r :,r w •'ti •a1 y,r i r,., ,f..t vA.•. wa. ir .+•9 r. ,K.r 1... r.' ,K V: rj Y., .ia r. ,.'�!.yl {��'r: r.'T;✓ ri �YAC r 'yar /•i..: .v: r +.r.•'•�' %.Ar'1�J�•: A; r.•- '.�:.J +�n]ry r;. "fir.• `!�'Yr /I�� "r� ]7�"' r rr dr,f} rr.• '.v. ••r:i:•;•'•' r1 /'%1�': .ti, a �•�1IY.+.'+:'r� +2'� ,f�/ +:y ,t•.•: .a.•. w�■ r'�, J ,f r�rSrr' .A:ir.'•�:re?:r !f r..r �V� .r_. •J� r. �)•ir1:`I. �F'•' ilr .r• i; Rn•. ,e: rya■. v: •ri 1W r%� _i11e: :i: *'y' l; ►�'I 7 ••t r �v... s ••J; /r✓'f' ..yr.. r' is iai�' v�iw' A'. •yrr�� }':.ir•:.. {�•t• �d t+ i r.�•' i i►ti'3 .�,!iiv:�.w• /lrj�T?�y;��I.• parr.•+ :•i, Y i f r� r y:� r,• .;f r .i V „�`•.a i ,f /�f ,,,,��JJ r 1' 'J .fit.. r j�f /r. l.• .�i' f /�'�'I��?I// f/} _.i'rif.'rl 4��•i.. r •aria �#I•.rYW� l '•r r 'fi I!; f '.r: �I r r ij •I, r r ",.i r;� �y' rI+C+IT ter r.; f r i rlir. •rr,• •..rfj(r,, /r ■rrw .:r 'A' r r i I•� 1 d •y' iJG w.I':.` a7rAfrn+ y yr yr'•: yl' r :r r w r rr ,ry r .�r f. rti•ar;.l .W l�l� i' f 1 i� y ,,,,,ry:95rf}�!�i�; r '.a +;,vr �+r.�. r -r'! r rrj•� `I.i rr::• :Y\: ir.•:•':•• v :i' ✓P •f r., ..ti.':: •I: :'1.;.�i �V.,. I rY,. r "I� ti••::; yi4. r �'.-HY 1!i• .r.i ..rliaQ'.:. "•r'• }::�!I I J '�f ..err.- •Rr :A :�'•.'�:eY. L :YI.... •rr rfi. j,J�.:_ is r' i'!i. J:•:•1 Ij '.I.. r i.:.r!. i�j,� r'. �.1iry,tl'rl!r�r. I,..:• t�.�.' 'T y�:.� •'a' 'ji .w•. .,J. r .y'l,�x {ir. %d. v,.• y�• r: R. r.'. .r. •ti r' rrr: ;.'w..r� r r •y;a r, ',r,:;,i�•.!r•;;. i: r,: -�'r;= ..:i� f :rr,,, r. r, r r. r y; �y'� y.`••;. ..i .;;r:; r.''• y lr. •J r ri:�. r•.;j��r :i rr',r::. i f I%''!wf •yi. :r'• r►, y' r •y/r1- si •'I .rl. Sri. r 'r►:..�r �r d r: i f;'� f' -:4ti' ..Yi{� .•i.r rr.' �r:. •.r,,• r. ff a. r I Fr. +r r• i.•I: •t r.� r k: I'.: rr r I •.v r.'1 r.•i -'�f J;'. .r rei`':'• :•i:. •,r: i i r R: r •r j •r+.' ••r:• r. r. %fi />r .r." t•,rr ,r�• r.�..'! .e.� •:v': .r., a✓•:J. Ja• r• r r.�: 'r' i.:': -,ti .'s''fr, ii rM" AS'. /I .•fi.' .�lJ sr r r:. i4' r �a. I� r. r %r.r l1: :•t. r/ r 't.•t ':ti 'e r.'s r. r r. r C r• r: rr.• r :s .r'r:. :�•:r5•'.' '�I r +.t,. '•fir rfJl• r .,r�• •r r f r r, •r r.• w �i: j t r Y ;r is f i :I R fi r' J• /�Ya' �'f.: :RV ra'. '1 r r:S :rte.':;:: r. i. ...r� R.r v ]i�:,.r ':i' .f:d •A,' i!r• 'f_ :'f'•� J•: ::v: •err r.. ii. ice`.•!-• is r r r." r .s:' r �A: vii �r rr' ,r :J rr r i• •r' .i r r IP i f.' .tir •aF r rrY r vr''C !1Y Vi i° 9 ii r' l ;i. r4r r �F, .'rr. .•'l:•i� i. r j j';• r,': ^i •i .T.! v i 'r ir r r::: r• :•t: r•' ��r. J '•ii r. r •v r r.. r:r:::r. ^:drf. is r w: r, '•-:r i •ri' •i"". �f. 'r►- ':•f'� i/.f .r•r•.i�rt /I r •r t' •.�S•r Jh' 7 r ..y ■r. i .r r r 'r t u':. J' �:2. %iii`' .i •i'� a Yyv.. J r "frsS�, ,y i iC .fir. r•i' rrr.r r +r.. r. r. :'I• v! f.. i::�- v is rr r Ji i rr_'- �r+e'�r: .4. :r.. ,I'r:'•- a ti•� r:� r' y '1i'•:.:: r,. •1 ,,.i1'. rw'... r .fir: r :r rf�' �0�1 f j!- /r rf.. r *r a' ifiL rt 't' da" i r C a r rr r, f% '•i. �'r: r'; I1►, yl: :...;f' •P ,,��r •dr::•:�. rII �'d• 'Yi '•!.r- �R,.r ./f.... J'•' :'ri,. •.v :rr; ri. .I d !rf /�r/r. y .�i. +�3?A"YJ��/i'� r.rf.�'��':�' r �v;:.. i;•�•__'rI �•f i f- rw J f.•r: J f;'r i� w:!Y�' r: Yr.. f r� r,�.: ,'i s fi•. ii�.�i •.lt:•. J r r, rr'• rr.•.� i i •r 'Y r /f J •�'r'W�'..•`'' I.Y' !r��d�rf' .t I er:•;!•f'.• e Je%! 7•';ti'. 'r it r J it /,��f I Jr Y.+ h A�i:.. J y+ A r� ,!J!� •'l J i` 'i r 'Yr r i r. 1.. •I: f/'r 1 iw r J f �'HN}�i.:. rYi �r a at f-e 77, mow' vN, e, —11V "W' 41NA '41k Ir Lar sand boils near the southwest corner of Treasure Island. Photo courtes of Dav1W T Schrier TRF-ASURE WAND REUSE PROJECT Troatum Lq4vd, Womia LOMA PRIETA AE-JARTHQUAKE PHOTOGRAPH pry ure B W, 1719,01 1 Ro U Alp ALA loll .471 4 =1 Sand boils and ponded water at school y ard on 12th Street, Treasure Island, on October 18, 1989. Photo courtes of -David T. Schrier TREASURE MAND REUSE PROJECT Tma=6 faar4 Wdm" LOMA PRIETA EARTHQUAKE I PHOTOGRAPH I MV I IL Q uestions 1. Vhat were the volumes and locations of wastes moved from Site 1 to Site 2 during construction of the runway. 'here 'n Site I did the wastes or'ginate? Where in Site 2 were the wastes deposited? 2. During the TCRA, for each location. in Site 1, Site 2, and Site 32 what were the volumes and depths of radiologically impacted soil excavated and removed? (Note that during the site tour, were told that there was very little waste and that it was only on the surface at the "radium disposal pit This seems counterintuitive in view of the Navy's letter that stated that radiologically impacted soil in Areas 3 a and 3b were deeper than expected.) 3. Where was radiologically impacted soil taken for disposal? 4. Dun"ng the `1 RA, for each location in Site 1 ghat were the volumes and depths of soil contaminated with PMI's that were excavated and removed? Was the burn area l b the only location involved`? 5. During the TCRA, what were the volumes of soil excavated from the firing, range berm?. What volume of lead- contarninated soil was disposed of of site and where did. it go? How far below grade did the excavation go. ''hat was the volume of below- grade material that was excavated and removed`? (A fonner Navy fighter pilot stationed at Alameda said that they took their Corvairs onto downward sloping ramps and test fired their 20-mm cannons into a below grade pit.) Was the soil removed from the fixing range berm surveyed for radioactivity? (Note that the exploratory trench in the area showed "'all rad contaminated 6. During the exploratory trenching, of the 57 cu yd of radiolo impacted soil removed, what volumes carne from the respective trenches. 7. Why are groundwater monitoring wells, sampled for groundwater monitoring reports, approximately 100 yd apart? At this spacing, contam -mated plumes as large as the known plume could be entering the Bay between monitoring wells. 8. Will the barge(s) that protrude from the bark along the shoreline be removed before transfer of the site'? This situation appears to present an attractive nuisance and danger to those (especially children) using the shoreline park. and beach area. 9. is excavation and removal of the most southern waste cell planned because of its proximity to the Bay, shoreline scisrnic weakness and the prevalence of radiologically impacted soil? August 14, 2008 '19IN'T op Ms. Anna-Marie Cook U.S. EPA Re IX 75 Hawthorne Street San Francisco, CA 94105-3901 DEPARTMENT OF THE NAVY BASE REALIGNMENT AND CLOSURE PROGRAM MANAGEMENT OFFICE WEST 1455 FRAZEE RD, SUITE 900 4 SAN DIEGO, CA 92108-4310 5090 Ser BPMOW.DR/0535 JUN 2 5 2008 Ms. Dot Lofstrom Department of Toxic Substances- Control 8800 California Center Drive Sacramento, CA. 95826-3200 Mr. John West R�,, Water Q ualit y Control Board 151.5 Cla Street, Suite 1400 Oakland, CA 94612 Dear Federal Facilit A Members: Sub j: PROPOSED CHANGE TO Cf..,OSURE STRATEGI-ES FOR SUE I AND SITE 32, ALAMEDA P01NT, ALAMEDA, CALIFORNIA nie Nav outlined a proposal to modif the closure strate for Installation Restoration (IR Site I at the April 15, 2(08 and J u ne 17, 2008 BRAG Ge4ailup Team (Bur) meetin Tile proposed ch,tln in strate is based upon the latest findin of the Sites 1, 2, and 32 Time-Critical Removal Action (TCR-A conducted from Februar 2007 throu the present, The Findin of the TCRA affect the Conceptual Site Models and the closure strate for ad Sites I and 32 and for the arei located cast of Site I and south of Site 32. This letter proposes a chan of closure strate for these areas. The Sites 1, 2, and 32 TCRA is now complete, with the exception of the final radiolo status surve some outstandin laborator anal and report preparation. To taccomplish the TCRA objectives for Sites I and 32 the Nav intended to: 1 determine the extent of sut•f radiolo Impacts; 2 Remove discrete radiolo objects frorn surface soil less than 2 feet below around surface and., 3 Obtain radiolo free-release for these areas. The'FCRA included Site 'I Areas 3a, 3b, 5b, and Site 32, which are outside of the landfill footprint. rhe potential for radiolo contamination in these areas was considered low, with potential radiolo contamination possible in surface soil due, to site I g-tnadin g spilla durin refuse shipment, and wind 3 erosion. Preliminar findin of the TCRA are as follows: Radiolo cont(amination is limited to radium which was used in the manufacture of 11,1111i Descent dials and g au g es; Low levels of nadlum-226 were fOLInd in soil at Site I Areas 3a, 3b, 51), 11nd ,it Site 32; the vertical extent was not investi below 2) fee t_b .Q,,Iow ground surface. 5090 Ser BPMOW.DR/0535 SUN 2 5 2008 The lateral extent of radium-226 in soil east of Site I and south of Site 32 was not completel determined-, and The lateral and vertic.a.1.1 extent of radium-2226 in soil does not fit the current conceptual site model s for q' re a bite 3a and 3b and Site 32, warrantin a chan in the model. Conditions at Site I Areas I a, I b, 2a, 2b, 4, 5a, and g roundwater were not investi as part of this TCRA.. Prior to the TCRA, no action was considered appropriate for Site 32 soil and the followin three remedial alternatives were considered for soil at Site 1, Area 3a and 3b: 1. No action; If 2, Tier 2 ecolo risk assessment, hot spot relocation, institutional controls, and a wetlands miti plan, 3. Tier 2 ecolo risk assessment, hot spot removal and off-site disposal, institutional controls, and a wetlands miti plan. While the low levels of radium-226 found at Site I can easil be identified in surface soil, deeper contamination ma not be detected b radiolo surve Given the deeper then expected containination at Areas 3a and 3b, and more widespread contamination than expected east of Site 1, at Site 32 and south. of Site 32, it would be appropriate to evaluate additional remedial alternatives for soil. Based upon the preliminar TCRA findin the Nav is proposin to remove portions of Site I and include them in Site 32. Site I would include Areas I a, I b, 2b, 4,5a, 5b, and g roundwater as described in the Site I Proposed Plan, In addition to Site 32 soil and g roundwater, Site 32 would be expanded to include Site I Areas 2a, 3a and 3b, arid soil located cast ol.'Site I and south of Site 32 actual extent to be. determined b a radiolo surve The Nav would then prepare the followin docunients: Site I Includes Areas I a,, I b, 2b, 4, 5a, 5b, and g roundwater. The existin Site I Draft R,OD will be used as a basis to issue a Draft-Final ROD describin the chan in strateg and deletion of Areas 2a, 3a, and 3b from Site I No chan are proposed for the selected remedies in the remainin areas, Durin the plannin sta of rernedialaction for Site 1, the Nav will conduct a radiolo surve to determine the lateral extent ofradiurn-226 at Site 12. Site 32 Includes soil at Site I Areas 2a, 3a and 3b, soil and g roundwater at Site 3211, and soil located east of Site I and south of Site 32 in an area y et to be determined. An RV FS addendum that includes findin from the TCRA and explains the addition of Site I areas and the expanded soil areas, A Site 32 Proposed Plan and ROD will be issued after BCT concurrence with the FS amendment. K 5090 Ser BPMOW.DW0535 'JUN 2 5 2008 The NCP at 40 CF- R Section 300.430(f)(3)(ii) sets forth the re that appl when new information becomes available after a Proposed Plan has been released to the. public that chan the proposed remed with respect to scope, performance, or cost such that the remed si differs From that described in the Proposed Plan. If the public could reasonabl anticipate the chan then a revised Proposed Plan is g enerall y not necessar the chan need onl be described M. the R-01), For areas to be addressed in the Site I R-OD, no si chan are anticipat d. 'rherefore, the Nav proposes to move forward on the Site I R.0 D without issuin a re v i sed, Proposed PI an orsee ri additional public comment. Site 32 will include a Proposed Plan and public comment period. This will ensure that the public is informed of, and involved with, the revised remed selection process for Site I Areas 2a, 3a, and 3b, Site 32 soil, and for those areas that had their proposed remed affec b the TCRA findin This strate minimizes dela with the selected remedies for Site I. while allowin BCT input and public review and cornment on soil and g roundwater remedies for Site 32. The Nav looks forward to discussin these proposed chan with the BC7 If y ou havei in q uestions or conitnents, please call Mr, Derek J. Robinson at (6 l9} 53.2-0951 or me at 619) 532-0907. Sincerel GEOI.i't"E PATRICK BROOKS BRAC Environmental Coordinator B direction of the Director Enclosures: (1) IR Site I Post-Remedial Excavation Na l Field Readin and Soil Sample lZa226 Anal Results 2) IR Site 32 Post-Reniedial Excavation Soil Sample Ra226 Anal Results (3 Current and Proposed Areas of Installation Restoration Sites I and 3) 3 5090 Ser BPMOW.DR10535 'JUN 2 U 2008 Cop to Ms. Xuan-Mai Tran U.S. EPA Re IX 75 Hawthorne Street San Francisco, CA 94105-3901 Ms. Suzette Leith U.S. EPA Re IX 75 Hawthorne Street San Francisco, CA 94105-3901 Mr. Robert Wilson California DPP 1616 Capital Avenue, MS 7405 Sacramento, CA 94234-7320 Mr. Peter Russell Russell Resource, Inc. 440 Nova Albion Wa San Rafael, CA 94903 Mr, Geor Humphre COMML1111t Co-chair Restoration. Advisor Board 25 Captains Drive Alameda, CA 94502 11 n '717 :KW I= 77 n '717 :KW I= 77 7 rr IRMA 4. MMM a �.ai 'h. ...v t.�r..... e a.. r... r�. 'F.. ur 33° ?>�r :023: x�S..•:py��yy�� '%ra'n� h Cv .aai... y�•� l]� y ffrry� 2 c.7 \'A a gm Cl el tu '21 vLGx lx, 4A 4B 7 kO 80 73 76 94 —.63 A 1 (3 141 T e `13 6 S41, 92 Zj LL C've rq v� 6i Lu LL i w r v�L m 1 mJ t E 1 u. 1rw S F vu,r assn. z S �2 to Y a �v s a d U Y1 r) IJ a J �J e n it S �'i C r .,ti. •�.n y a !"r� "i. 2"' F fir' 6!�'' 1 1 C', f n Ca n y s, t.. (y� 0 E��i Ut 16-1 C11 r) I �1'1 to x a i i n e, t h arici Selsmkw: SLUdy \Aj as eQrce n di u c t e a abilit of the �64.mbankmerit Uhiia­ S P a r i �;p -1 E 0 Z,,-�rze� of SOHO wa-ste from, the, to 11 a V I 10 releases iof solid wasfi--11' intc. Sari Fral"Ic"CC Contarlinants identifielCill 111 soil icxaI (TPM. R.4f4s, pesficides )efro/eum h I I S, PCBs. metalzs-, and radlurn,, For mana P LW P Oses, the site was divided. into the toliowirl VVC_, g eo g raphical areas for soil (see R 3'1, and site­ wide radium-impacted wast',e In soil. TR14 rC,,onlamination is bein addressed under a separate corrective action pro rand is nc,,�t discussel-11 further in this Proposed Plan, AREA 5b j pp 0 1 ti 0 1, acl V 0 t j S p� p� Area a _dE it s LO axiwa,�. s) UL L 'i iwa s and t J I ­'a,4'olo surve w e, o t 'sposal area, rM CV clandu;cted becaLise P aved s�..)ffasces S h lev I d radfum level's frorn detector,�,,; Are,, 2 IS`� presumen, to have elevated radiunn levels I rn 11 a to those, in Area 3 k see discussion below' 'de Area 3 consists of the unpaved areas outst -)f the former disposal are,@, Surface, soil in this area is contaminated with RAHs, PCBs, and metals. In addition, elevated t-adium levels Were measured in Area Area 4 consists of The former P istol r�an berni, and is located within the bourdarles of Anll=�-a 1 S U rf, ace soil in this is conta, rninated wittl FIAH,s PCBS, 1�3110 c� S ve 0 C`0 I'l Gle 17 an(y �eAl M Oakinnd Inver HPqioir n i fi A J i BURN ARFA 'ter.: 'rea ofe <y £ri•�, ,�,g t 9 O`H AREA F h MA AREA to AREA 3b in s;TF I RGkA1JDAR`,,' I F- 0 OT FJ _P V A r 0 N C ON TM-4-i Wri'RIV A L F A N, �1, Al F T 11 D F_ i F.' t ON D AP BUR-CmNe OR VrRUCITUMI ROAD OR RUW4AY [771 PIRO% r Q N11"A"JED AM A UUTy-,MC- i) kp 2 a .{`f i:7: tS• z t.: i[ i _N_U_