2006-11-01 Regular ARRA MinutesAPPROVED
MINUTES OF THE REGULAR MEETING OF THE
ALAMEDA REUSE AND REDEVELOPMENT AUTHORITY
Wednesday. November 1, 2006
The meeting convened at 7:19 p.m. with Chair Johnson presiding. 2-A
1. ROLL CALL
Present: Marie Gilmore, Boardmember, City of Alameda
Doug deHaan, Boardmember, City of Alameda
Frank Matarrese, Boardmember, City of Alameda
Tony Daysog, Boardmember, City of Alameda
Absent: Beverly Johnson, Chair of Alameda
2. CONSENT CALENDAR
2 -A. Approval of the minutes of the Regular Meeting of October 4, 2006.
Member Daysog pulled Item 2 -A to articulate what he meant when he referenced certain letters
regarding the ARRA's No -Cost EDC with the Navy. He reiterated his point that if we could
return to the original understanding of the housing units that could be built -out per the
documents agreed to by the ARRA and the Navy, perhaps we would not have to pay the
$108,000 million the navy is now requiring. Member Daysog wanted to make sure this point
was captured in this evening's meeting, since it was missed in the Minutes of October 4th.
2 -11 was motioned by Member Daysog, seconded by Member deHaan and passed by the
following voice vote: Ayes — 3; Noes — 0; Abstentions — I (Member Gilmore was not present
at the 10 -4 -06 ARRA meeting).
2 -B. Recommendation to approve consultant agreement with Moffatt & Nichol Engineers for
Pier Condition Analysis at Alameda Point in an amount not to exceed $170,226
Approval of 2 -11 was motioned by Member Daysog, seconded by Member deHaan and
passed by the following voice vote: Ayes — 4; Noes — 0; Abstentions — 0 .
3. REGULAR AGENDA ITEMS
3 -A. Alameda Point Project Update
Debbie Potter, Acting Alameda Point Project Manager, gave an overview on the Master
Developer RFQ process. At the direction of the Board, the RFQ was issued on October 19th with
a mandatory bidder's conference on Monday, October 30th. There were 20 firms that attended
the bidder's conference. All due diligence documents were provided on a CD and an FTP site
available for all interested firms, and a comprehensive download of the land planning, the
environmental issues, the public trust, summary of term sheet; and an opportunity for those
present to ask questions. One -on -one meetings were also offered with the firms intending to
respond, with nine firms signed up. Responses are due December 4, 2006 and need to be
Page 2
accompanied by a $20,000 non - refundable filing fee. The responses received will be evaluated
and brought back to the ARRA should we receive responses with a recommendation to enter into
a 45 -day negotiation period.
There was one speaker slip, Andrew Sliflca, long -time Alameda resident and also a representative
of the Carpenter's Union in Alameda County, and speaking on behalf of the Constriction
Building Trades Council of Alameda County. Mr. Sliflca addressed concerns and disappointment
with the Alameda Point Community Partners (APCP) withdrawal from the project since they had
a Project Labor Agreement with APCP. He urged the Board to look at the same requirements for
any developer that should come forward, because Project Labor agreements bring value to the
community, well - paying jobs with benefits, careers and local work opportunities.
Member Daysog asked if specific questions regarding the financing of the project were outlined
in the RFQ. He commented on the financing /business model associated with revitalizing the
Catellus project and how it was distinct from the business model that was employed for the rest
of Alameda Point. He also discussed incorporating a different business model.
David Brandt, Deputy Executive Director, responded that developers will be asked who their
source of capital is and for a deposit of "earnest money" in the amount or $1 million before a
developer is selected. This information will be provided to the Board.
Member Daysog asked if the potential developers understood the amount of property open for
redevelopment. Ms. Potter responded that the $108 million purchase price is based on Phases 1
and Phases 2, which is essentially everything but the Wildlife Refuge and the area south of
Atlantic Ave. and north of the 26 -acre park, plus the golf course. David Brandt also clarified that
we were carefiil to let the developers know that the PDC wasn't an entitlement.
Member Matarrese asked whether a Project Labor Agreement (PLA) was presented to the
bidders as part of the package that APCP (former master developer) put together. Debbie Potter
responded that a PLA was not included in the RFQ and that it was not a requirement of the City
when the first master developer was selected; but that a PLA was voluntarily agreed to by at least
two out of the three finalists during the first master developer selection process.
Member Matarrese requested that bidders be notified that a PLA was part of the original
agreement and that the City does have a policy on prevailing wage. He was concerned that
bidders would try to make their numbers work at the cost of labor. Ms. Potter said that a copy of
the previously agreed -to document will be posted on the RFQ FTP site.
Member deHaan discussed extending the current month -to -month leasing policy to a year -to-
year policy in anticipation that the master developer would start taking down property. David
Brandt acknowledged that the current ARRA direction is that all leases over a year come to the
ARRA, and that potential tenants are told that redevelopment is imminent so long term leases are
not being offered. This is being reevaluated to decide whether to start bringing longer term leases
to the ARRA.
Page 3
Leslie Little, Development Services Director, agreed to revisit the leasing policy at the beginning
of next year in anticipation of activity after the master developer selection process. She added
that some tenants, approved by ARRA, have longer leases because they are making significant
improvements and receive rent credit for those investments, not done by ARRA.
Member Gilmore wants the public to know what kind of timeline we're working with and asked
what was the soonest possible time frame after the master developer is selected will we enter into
an agreement (not even actually shoveling dirt or tearing down buildings, etc.) David Brandt
responded that the soonest would be two years. Member Gilmore commented that this increases
the timeframe "window" and recommended that when staff returns in January with the study
session of the leases, it might be worthwhile to take a look at not just the -1 and 4th phases, but
the I" and 2" a phases, too. Ms. Little clarified that we will be presenting an entire overview of
all the leasing and it can be compared against the PDC.
No action was taken on this item — it was an update and for informational purposes only.
3 -B. Alameda Point Environmental Remediation Update: Western Shoreline — IR Sites
1,2, and 32, Soil at IR Site 25 (Coast Guard North Housing), and Compliance with
Marsh Crust Ordinance
Debbie Potter gave an update on the clean -up status of these specific IR sites, as requested at the
October 4 ARRA meeting. Peter Russell, environmental consultant from Russell Resources, was
available to answer questions from the Board as a follow -up to the staff report provided.
Member Matarrese's main concern was the Navy's option to install an engineered cap rather than
a soil cover over landfill waste. Member Matarrese, along with the rest of the Board members,
discussed at length their preferred alternative: having the Navy scoop out the landfill sites and
haul it away.
Debbie Potter discussed the process by which Peter Russell reviews all documents the Navy
promulgates regarding all IR sites. She explained that we comment during the public comment
period, but we do it at a staff level. She agrees with Member Gilmore about the policy -level
decision that we want clean -up to a level that supports the community reuse plan and the PDC,
and that the Navy has committed to clean -up to the reuses that are identified in the PDC. Ms
Potter fiirther explained, and reiterated by Peter Russell, that the ARRA- preferred option to
scoop and haul the landfill is not economically feasible — and an engineered cap is potentially
equally effective. She said that the City advocated the engineered cap since the beginning when
we secured the pilot grant from EPA. Ms. Potter stated that the engineered cap is financially
viable and is scientifically the best solution, a decision staff concluded in consultation with
environmental experts.
Member Matarrese commented that he had issues with the feasibility, that it didn't sound so
daunting at the RAB meetings and that the scoop and haul option is actually feasible. Peter
Russell responded that from a technical standpoint, the scoop and haul option would cost more.
Debbie Potter sought direction from the ARRA as to a response for the public comment period
th
due to the Navy by Nov. 10
Page 4
Member Matarrese motioned to direct staff to submit a letter to the Navy during the public
comment period to include the ARRA policy aspect and endorse the preferred solution of
scoop and haul, rather than an engineered cap. This motion was seconded by Member
Daysog and passed by the following voice vote: Ayes — 4; Noes — 0; Abstentions — 0.
4. ORAL REPORTS
4 -A. Oral report from Member Matarrese, RAB representative.
Report was covered in discussion of Item 3 -13, above.
ORAL COMMUNICATIONS, NON - AGENDA (PUBLIC COMMENT)
Mayoral Candidate, Kenneth Kahn, stated that it would be an honor to serve with all of the
members of the Board.
5. COMMUNICATIONS FROM THE GOVERNING BODY
Member deHaan clarified a comment that was made regarding parolees working at Alameda
Point. He stated that we indeed had parolees working at Alameda Point about 10 years ago
through the Volunteers of America Program, under the control of the Navy. He explained that
we were short of man- power, so we utilized San Quentin inmates that were being transitioned for
landscaping and maintenance.
6. ADJOURNMENT
Meeting was adjourned at 8:37 p.m.
Respectfidly submitted,
Irma Glidden
ARRA Secretary