Ordinance 3018CITY OF ALAMEDA ORDINANCE NO. 3018 New Series APPROVING AMENDMENT TO MASTER PLAN MPO5-01 FOR A. GRAND MARINA VILLAGE TO REDUCE THE NUMBER OF REQUIRED AFFORDABLE HOUSING UNITS BE IT ORDAINED by the City Council of the City of Alameda that: Section 1. In accordance with Subsection 30-4.20 of the Alameda Municipal Code, Master Plan MPO5-01 and Master Plan Conditions of Approval, as approved on January 16, 2007 is hereby amended as shown in Exhibit "A". Section 2. The above Master Plan MP-05-01 shall be known as and referenced to as Grand Marina Project Master Plan dated July 17, 2006, as amended. Section 3. This Ordinance shall be in full force and effect from and after the expiration of thirty (30) days from the date of its final passage. Presiding Office ncil Attest: Lara Weisiger, CityJIerk Exhibit A: Section III: Architectural Design Concepts subsection entitled "Affordable Housing" shall be amended as follows: "Affordable Housing ": The project provides 14 six () units of below market rate housing, which are dispersed throughout the residential development (see Landscape Plan), of a quality and style consistent with the market rate units, and will be available to households with very low, low, and moderate incomes, per City and County standards. By providing 1 5% of the units as affordable below market rate units, the project is the first to meet consistent with the amended requirements for construction of residential units within the Business and Waterfront Improvement Plan (BWIP) area." The Master Plan Conditions of Approval approved by the City Council on January 2007 shall be amended to include the following three conditions: 1. Prior to issuance of the first building permit for Phase 1, Warmington shall submit a landscaping plan for the street median on Grand Street for Public Works Department approval. Median must be landscaped and inspected by the Public Works Department prior to issuance of the first building permit for Phase III. Landscaping in the street median will be irrigated with existing City facilities in median and adjacent control features, but maintenance costs for street median will be the responsibility of the developer and will be incorporated in a maintenance agreement with the City. 2. Prior to issuance of the first building permit for Phase III, Warmington shall complete the grinding and overlaying of both sides of Grand Street, from the centerline of Fortmann Way to the special concrete paving at the end of Grand Street from curb to curb, in accordance with City standards and the already approved Conditions of Approval for the repaving of the western side of the Grand Street. Final work must be approved by the Public Works Department. 3. Prior to issuance of the first building permit for Phase III, Warmington shall extend the Project's landscaping concept into the City's adjacent existing landscaped areas at the end of Grand Street (Grand Street Boat Ramp Park), repair and replace the irrigation system, as needed, and provide for soil amendments. Developer shall seek Recreation and Parks Director field approval of the proposed planting and final inspection of work. The City will continue to maintain the landscaped areas. This excludes the street median referenced in paragraph 1 above. 1, the undersigned, hereby certify that the foregoing Ordinance was duly and regularly adopted and passed by the Council of the City of Alameda in a special meeting assembled on the 6th day of July, 2010 by the following vote to wit: AYES: Cou ncilmem hers deHaan, Gilmore, Matarrese, Tam, and Mayor Johnson — 5. NOES: None. ABSENT: None. ABSTENTIONS: None. IN WITNESS, WHEREOF, 1 have hereunto set my hand and affixed the official seal of said City this 7th day of July, 2010. Lara Weisiger, City 0 City of Alameda