Loading...
Resolution 02322RESOLUTION NO. 2322 ESTABLISHING PREVAILING VAGE SCALE RESOLVED by the Council of the City of Alameda, aa follows: Pursuant to the provisions of Sections 1770 to 1777, inclusive, of the Labor Code of the State of California, the general prevailing rate of per diem wages in the City of Alameda, for each craft or type of workman hereinafter mentioned, is hereby ascertained and determined to be es follows: cLAssriraclzioN SCALP PER HOUR Asbestos Workers (8-hrs.) •... •... ..• ••• • •...• . • $1.25 Asphalt Mechanical Finish Operator (6 hrs.) . . . . . . . . 1.5C Boiler Makers (8 hours) . • •.. • •a. • • dow• • • eaw• •O• 1.50 Boiler Makers - helpers (8 hours) . . . . . . . . . • . . . 1.371- Boiler Makers - Welders (6 hours) . . . . . . . 1.50 Boiler Makers - holder-on and Heaters (8 hours) . . . . . . . 1.37* Bricklayers (6 hours) . . . . . . . . . . . . . . . . . . . . . . 1.75 Bricklayers Hodcarriers (6 hours) . . . . . . . . . . . . . 1.35, Blade Grader Operator - finish work (8 hours) . . . . . . . . . 1.624f Cabinet Workers. - outside (8 hours') . , . . . . . . . . . . . 1.25 Carpet and Linoleum Layers (8 hours). . . . . . . . . 10.00 per day' Carpenters (8 hours) . . . . . . . . . . . . . 1.25 Concrete Mixer Operator ( 6 hours) - Except Paving Type . . . . . . 1.25 Cement Finishers (8 hours) •.• ,0•60.e •Ot• • •MO•e• • 1.25 Concrete Mixer Operator (8 hours) - Paving Type . . . . . . . . • 1.00 Cement Finishers - Foreman (8 hcurs) . . . . . . . . . . . 1.37;1,- Lragline Engineers (8 hours) . . . . . . . . . . . 1.66-2/3. Electrical Vhrkers (8 hours) ., . . . . . . . . . . 1.37 Electrical Workers - Helpers (8 hours) . . . . . . . . . .75 Electrical Fixture Hangers (8 hours) . . . . . . . . . 1.37* Elevator Constructors (6 hours) • . • • •••.• , •P•00e• • • 1.40 Elevator Constructors - Helpers (8 hours) , . .21 Engineer - Compressor (8 hours) . . . . . , . . . . . 1.25 Engineer - Hoisting on Building (6 hours) . . . . . . . . . . . 1.37i EnEineer - Structural or Steel Erection (8 hours) . . . . . . . . 1.60 Firemen (8 hours)..• ..• • •0000.10•041 • • • • • •Q• • 1.16-2/3 Furniture Handlers (8 hours) . • . . , . . . . . . . . . .82* Gas Appliance and Stove Fitters (8 hours) . . . . . . • . • • 1.00 Glaziers (8 hours) • • . • • • • . • •m• •0•0•064 • OPOO• 1.21 Hardwood Floormen (6 hours) . . . . . . . . . . . . . . • 1.25 Ironworkers, Structural and Bridge (8 hours) , . . . . . . . 1.50 ,Ironworkers Welders (8 hours). . . . . . . . . . . . . . 1.50 ‘Ironworkers2;-Tli Rigging (6 hours) . . . . . . , . . . . 1.50 Ironworkers', Housesmiths, Arch, Iron (8 hours) . . . . . . . . 1.25 Ironuorkers, Housesmiths, reinf. concrete or roamen (8 hours) . . . 1.25 Ironworkero, Ornamental Inside (6 hours) . . . . . . . . . . . . . . 1.121 Ironworkers, Ornamental Outside (8 hours) . . . . . . . . . • . 1.2b Asphalt and any hot-stuff rakers end droners (8 hours) . . . . . . 1.10 Asphalt and any het-stuff shovelers (8 hours) . . . . . . . . . . .87i Building Laborers (8 hours). •00.0•VOO• •WO• • ••• •WP 9 .624 Conomete or form strippers (8 hours) . . . . . . . . . . . . .84 Concrete Pan Installing (8 hours) . . . . . . . . . . . . . . . . 1.01 Concrete Workers (wet and dry) - (8 hours) . . . . . . . . •ale Cribbers (8 hours) . . . . . . . 1 10 Gardeners (8 hours) . . . . . . . . . . . . . . , General Laborers (6 hours) ••• • • • • •OO•••0• •000.0 • 611 Headerboard Men (8 hours) . . . . . . . . . . .84 House Movers (6 hours) . , . . . . . . . . . . . . . 1.00-1,25 Jackhammer Operators (and handlers or pneumatic tools) under 40 pounds (a hours). . .61* Jackhammer Orerators (and handlers at pneumatic tools) 40 pounds and over (6 hours). . .97 Guards (8 hours) • • • ... . . • • •D•00• • • . • • • • •000 051 Flagmsen (8 hours) • • • • • •0. • • • • •••• • • • • • •O• • • .54 Truck Laborers (8 hours) . . . . . . . . . . . . . .64 Termite Control (8 hours) . . . . . . . . . . . . . .QC - 1,25 1 ' Vibrators under 2-t" da- mension (8 hours) . • . . . . . . . . . . . .84 Vibrators over 2" dimension (8 hours) . . . . . . . . . . . . .57 Eatchmon (8 hours) • • •.....• • • • • • • .84 Blasters and Powder Men (6 hours) . . . . . . . . . 1.10 Sheeting, lagging, timbermen, cribbing, bracing and propping ( 8 hours) . 1.10 Vitrified and concrete pipe laying laborers (8 hours) . . . . . . 1.1C Sewer (8 hours) . . . . . . . . . . . . . . . . . . . .87*- Lathers (6 hours) •OO• •90• •0. • • 7 • • •O• • •Ot$ • -01.60 Lumber Handlers (a- hours) ...... . . . . . . . . . . . . .75 Lumber Clerks ( 8 hours) . . . . . . . . . . . . . . . .90 MARBLE SETTERS (8 hours) . . . . . . . . . . . . . . . . Carvers • • • • • •O• • • 9 •Omm• • •0•0•0• • • • • • • 10.50 per day Cutters . . . . . . . . . . . . . . . . . . 5.00 Carborundum copers . . . . . . . . . . . • 8.00 Bed Rubbers 4 • pO• •OD•O• • ..00emay•• 40.• • •00 7.50 Polishers ..• •.. • •P• • • 0.• •M4 •OPO• OP. •. 7.00 Band Sawyers . . • . . . . . . . . 6.50 Setters' Helpers. . . . , . . . . . . • 6.50 ' workers, Structural (8 hours) . . . . 1.50 CLASSIFICATION SCALE PER HOUR Mechanic - General Repairman ( 8 hours.) . . . . . . . . . . . . . . 4 1.25 Automotive Machinists ( 6 hours) . . . . . . . . . . . . . . . . . • 1.25 Mechanic - Trouble shooter ( 8 hours) . . . . . . . . . . . . . . . 1.25 General Mechanic and Combination uelder ( 8 hours ) . . . . . . . . . 1.35 Apprentice - 1st year ( 6 hours) . • . . . . . . . . . . , . . . . . .65 Apprentice - End year ( 8 hours) . . . '• . . . . . . . . . . . . . . 1.00 Apprentice - Ord year ( 8 hours') . . . .. . . . . . . . . . . . . . 1.25 Machinists (8 hours) • • • . a • a o- o • • o o o 1.25 Machinists lleiners (8 hours) • • 0 O•e• •e• •• •■ 2 es 66 .90 Machinists - Combination Welders (6 hours) . . . . . . . . . . . . . 1.371' Modalers (6 hours).• • •••• • ••eov• o ••o•ot •moo 2.00 Model Makers ( 6 hours) . . . . . . . . . . . . . . . . . . . . . . 1.25 Model Casters (6 hours) '. . . . . . . . . . . . . . . . . . . . . . 1.10 Mosaic and Terrazo (8 hours) . . . . . . . . . . . . . . . . . . . . 1.25 Mosaic and Ter-raze Helpers (3 hours) . . . . . . . . . . . . . . . . .75, Millman, sash and door (8 hours) . . . . . . . . .......... 1.06D 1'. Millaen, ulaning mill department (8 hours) . . . . . . . . . . . . . 1.064 Oilers and Firemen (e hours) . . . . . , . . . . . . . . . . . . . . 1.16-2/3 Operatore of Mower Shovel und/or other Excavating machines Tiith shovel type controls . . . . . . . . . . . . 1.66-2/3 Fainters (7 hour-, ) •p• •w e•woww•e• • • • •W• • ••• V 1.25 Painters - Spraymen (7 hours) . . . . . . . . . . . . . . . . . . . . 1.55-4/7 Painters - Structural Steel (7 hours) . . . . . . . . . . . . . . . 1.53-4'7 Sand Blast °aerators - preparatory to paint (8 hours) . . . . . . . . 1.55,4/7 Pile Drivers and Wharf 2uilders (6 heurs) . . . . . . . . . . . . . . 1.40 Pile Drivers - Engineers (8 hours) . . . . . . . . . . , . . . . . . . 1.60 Plasterers (6 hours) . . . . . . . . . . . . . . . . . . . . . . . . . 1.66-2/3 Plasterers Hodcarriers (6 hours) . . . , . . . . . . . . . . . . . . . 1.45 Plumbers (8 hours) . . . . . . . . • . . . . . . . . . . . . . . . . • 1.37-i Plumbers Helpers (6, hours ) . . . . . . . . . . . . . . . . . . . . . . 6.00 per day Holier Operators (6.hQuXs . . . . , . . . . . . . 1.50 Roofers ( 6 tours.) . . . . . . . . . . . . . . . . . . . . . . . . . . 1.25 Sheet Metal Workers (6 hours) . . . . . . . . . . . . . . . . . . . . 1.25 Shovel Operators, ( 8 hours) . . . . . . . . . . . . . . . . . . . . . 1.65-2/3 Shovel Operators (underground (8 hours). . . . . . . . . . . . . . . . 1.63-1/Z Sign Padnters (8 hours)..•.•.. •0•0• •Cp•O020•0• • 1.50 Sign Painters Helpers (8 hours). . . , . . . , , . . . . . . . . . . . 1.21-5/7 Shovel Oranemen (6 hours) . . . . . . . . . . . . . . . . . . . , . . 1.41-2/3 Shovel Firemen (6 hours) . . . . . . . ... . . . . . . . . . . . . . . 1.16-2/3 Shovel Firemen .0 underground (6 hours) . . . . . . . . . . . . . . . . 1,33-1/3 Shovel Oilers (6 hours) . . . . . . . . . . . . . . . . . . . . . . 1.16-2/5 Shovel Oilers - underground (6 hours) . , . . . . . . . . . . . . . . 1.33-1/5 Sprinkler Fitters (6 hours) . . . . , . . . . . . . . . . . . . . . . 1.25 Sprinkler Fitters Helpers (6 hours) . . . . . . . . . . . . . . . . . .75 Steamfittero (8 hours) . . . . . . . . . . . . . . . . . . . . . . . . f Steamfitters Welders (6 hours) • • • • • • •...• •.• • aao• •0 1.572 Steamfitters Apprentices (6 hours) . . . . . . . , . . . . . . . . . . 6.60 per day Stone Setters, soft and granite (6 hours) . . . . . . . . . . . . . . 1.75 Stone Derrickmen (6 hours) . . . . . . . . . . . . . . . . . . . . . . 1.25 Tile Setters (6 hours).• •-• • • • • • • • • • •ev• • 6 • • a 1.37:t Tile Setters Helpers (8 hours) . . . . . . . . . . . . . . . . . . . . .56 Truck Crane Engineers (8 hours) . . . . . . . . . . . . . . . . . . . 1.66-2/3 Tractor Operators . . '. . . . . . . . . . . . . . . . . . . . . . . . 1.50 Truck Drivers, freight - under 10,500 pounds . . . . . . . . . . . . . 7.00 per day Truck Drivers, freight - 10,500 pounds and over . . . . . • . . . . . 6.00 per day Truck Drivers, auto - less than 4 yards (6 hours). . . . . . . • 7.50 Truck Drivers', auto - 4 yards and over (8 hours) . . . . . . . . . . . 6.50 " 0 Transit Mdx Truck Drivers - less than 4 yards (6 hours) . , . . . . , 8.00 " YY Transit Mix Truck Drivers - 4 yards and over (6 hours) . . . . . . . . 9.20 General Teamster, 1 horse ( 3 hours) . . . . . . . . . . . . . . . . 6.00 ' 12 General Teamster, 2 horses (6 hours) . . . . . . . . . . . . , . . . 8.00 ° 0 General Teamsters, 4 horses (8 hours) . . . . . . . . . . . . . . . . 9.00 Plow Teamsters, 4 horses (8 hours.) . . . . . . . . . . . . . . . . . . 9.00 Scraper Teamsters, 2 horses (8 hours) . . . . . . . . . . . . . . . . 8,00 " A Scraper Teamsters, 4 horses (8 hours) . . . . . . . . . . . . . . . . 9.00 1' 0 Upholsterers - Drapery and Shade Workers - Male (8 hours) . . . . . . 1.05 Upholsterers - Drapery and Shade Workers - Female (8 hours) . . . . . .61- OVERTIME RATES: Unless otherwise specified, at the rate of DOUBLE TIME. TEAMSTERS: All overtime rates et time end one-half. SHEET METAL 40 65: Time and one-half first hour, and double time thereafter, LUMBER CLERKS': Double time Saturday afternoon end all Holidays. UPHOLSTERY, DRAPERS- ANE SHADE WORKERS: Double time after the first four hours. CARPET ' NCiEUM. & T133 WORKERS: Double time after the first two hours, AADOREHS: Time and one-half fpr the firat four hours, double time thereafter, Double title Saturday afternoons, Sundays and holidays. cARPENTERE: Time and one-half for the first four hours, double time thereafter. Double time Sati•rdays, Sundays and Holidays. SHIFT WORK: Two or more consecutive shifts, 7 hours work at 8 hours pay. RESOLVED FURTHER that whenever the aforesaid provisions of the Labor Code apply to any public work authorized by the City, or to any contract for such public work awarded by the City, not less than the aforesaid prevailing rate of per diem wages, hereinbefore ascertained and determined for each respective craft or type of workman, shall be paid on ouch work. I, the undersigned, hereby certify that the foregoing Resolution was duly and regularly introduced and adapted by the Council of the City of Alameda in regular meeting assembled on the 17th day of January, 1939, by the following vote, to alt: AYES; Councilmen Carrington, Godfrey, Maurer, Morris and President Yeichhart, (5). NOES: None. AR3ENT: None. IN WITNESS WHEREOF, I have hereunto aet my hand and affixed the official seal of said City this 18th day of January, 1939. D. ELMER DYER City Clerk of the City of Alameda. * 4 * I hereby certify that the foregoing is a full, true and correct copy of "Resolution No. 2322, ESTABLISHING PREVAILING WAGE SCALE", introduced and adopted by the Council on the 17th day of January, 1939. City Clerk J-he' Cl:ty of Alameda.