Resolution 09706GNAL
RESOLUTION NO. 9706
A RESOLUTION OVERRULING PROTESTS AND
AMENDING RESOLUTION NO. 9673, A RESOLUTION
OF INTENTION TO MAKE ACQUISITIONS AND IMPROVEMENTS
HARBOR BAY BUSINESS PARK ASSESSMENT DISTRICT 81 -1
RESOLVED, by the City Council of the City of Alameda, Alameda County,
California, that
WHEREAS, on January 19, 1982, this Council adopted Resolution No. 9673, A
Resolution of Intention to Make Acquisitions and Improvements;
WHEREAS, notice of the time and place of hearing protests in relation to
said proposed acquisitions and improvements was duly given and all written protests
and other written communications were publicly read at said hearing and all persons
desiring to be heard were fully heard;
WHEREAS, said Resolution of Intention to Make Acquisitions and Improvements
should be amended as hereinafter provided;
NOW, THEREFORE, IT IS ORDERED as follows:
1. That protests against said acquisitions and improvements, and /or
matters related thereto, were not signed and duly filed by the owners of a majority
or more of the area of the lands within the assessment district, or of the area of
the lands within the assessment district assessed for the costs and expenses of
said acquisitions and improvements.
2. That said protests, and each of them, are overruled.
3. That Exhibit "A" to said Resolution of Intention be replaced with
Exhibit "A" attached hereto and hereby made a part hereof.
* * * * * * * * * * * * * **
I, the undersigned, hereby certify that the foregoing Resolution was duly
and regularly introduced and adopted by the Council of the City of Alameda in
regular meeting assembled on the 2nd day of March , 1982, by the
following vote, to wit:
AYES: Councilmen Diament, Gorman, Sherratt, Stone and President Corica - 5.
NOES: Councilmen (None)
ABSENT: Councilmen (None)
IN WITNESS WHEREOF, I have'hereunto set my hand and affixed the official
:seal of said City this 3rd day of March
2
, 1982.
City the City Adam
Rev. 12/14/81
Rev. 02/25/82
HARBOR BAY BUSINESS PARK ASSESSMENT DISTRICT 81 -1
City of Alameda
General Description of Work
The construction of the following improvements (all distances and
measurements are approximate only):
1. The construction of street improvements, including clearing,
grading, subbase, base, pavement, curbs and gutters and
clriveways, sidewalks, storm drainage facilities, sanitary
sewers and appurtenances, a system of domestic water supply
including fire hydrants, street lights and electrical
distribution facilities, telephone ducts, cable T.V. ducts,
gas mains; landscaping and irrigation, monuments and
relocation of facilities and all other necessary improvements
and appurtenances in Harbor Bay Parkway from the intersection
of Maitland Drive to 1873 feet southwesterly a distance of
1873 feet with a right of way width of 1 08 feet, two traveled
ways of 26 feet each together with a median 20 feet in width
and a bicycle path 10 feet in width along the northwesterly
side of said street.
2. The construction of street improvements including clearing,
grading, subbase, base, pavement, curbs and gutters,
sidewalks, storm drainage facilities, traffic signal system;
striping and signing; landscaping and irrigation; street
lighting; relocation of existing facilities, and all other
improvements and appurtenances necessary to provide a fully
coordinated intersection at the intersection` of Harbor Bay
Parkway and Doolittle Drive for a distance of 700 westerly
and 1500feet easterly of Harbor Bay Parkway on Doolittle
Drive within existing right of way of 160 feet and with
pavement varying in width from 40 feet to 102 feet on each
side of Harbor Bay Parkway and on Harbor Bay Parkway
southerly 350 feet with a varying width from 40 feet to
88 feet.
3. The construction of a sewage pump station located 810 feet
southwesterly of the intersection of Maitland Drive and
Harbor Bay Parkway at the north side of Harbor Bay Parkway
as described in 1 above; including any required metering
HARBOR BAY BUSINESS PARK ASSESSMENT DISTRICT 81 -1
EXHIBIT A
equipment, 2,000± feet of force main and appurtenances along
Harbor Bay Parkway to Maitland Drive, thence northwesterly
along Maitland Drive to Fitchburg Avenue and northerly on
Fitchburg Avenue to connect to the existing gravity sanitary
sewer at Beach Road including all required structures and
appurtenances to provide a completed sewage pump station and
force main.
4. The construction of a storm drain outfall located 40feet
northwesterly of the southern corner of Assessorfeets Parcel
No 74- 1040 -4 -5 along the southwesterly line of said parcel,
including 36" diameter storm drain pipe, headwalls, grading
and ditching and all appurtenances to construct an operative
outfall structure.
5. The construction of an electrical duct system along Maitland
Drive from Fitchburg Avenue to Harbor Bay Parkway, a distance
of 1200 feet including ducts, structures, and all
appurtenances to provide a completed duct system for
electrical distribution.
6. The construction of a telephone duct system from - Island Drive
southwesterly 1,000 feet and southeasterly 4,400 feet
connecting to ducts in Harbor Bay Parkway as described in 1
above; including ducts, structures and all appurtenances to
provide a completed duct system for telephone distribution.
7. The upgrading of an existing 18" sanitary sewer force main
from the Bay Farm Island Pump Station located at the
intersection of Island Drive and Golf Course Memorial Drive
easterly along Island Drive to Bridgeway a distance of 1,400
feet, by replacement, lining, addition of structures and
appurtenances and such other work to provide a fully
functional force main.
8. The upgrading of the Beach Road sewer from Fitchburg Avenue
to Island Drive, a distance of 3,150 feet, by television
inspection, replacement as required, ; lining, addition of
structures and appurtenances and such other work to provide a
fully functional sewer line:
9. The installation of landscaping at various locations
including the entrance area adjacent to Harbor Bay Parkway
and Maitland Drive, along Harbor Bay Parkway on the easterly
side for 2,000 feet northerly of Maitland Drive, and the
intersection of Harbor Bay Parkway and Doolittle Drive
including planting of trees, shrubs and lawns, automatic
irrigation systems, any required lighting, controls and
appurtenances to provide fully functional landscaped areas.
HARBOR BAY BUSINESS PARK ASSESSMENT DISTRICT 81 -1
EXHIBIT A
10. The correction and replacement and /or realignment of existing
storm drainage facilities necessary for the protection of the
above improvements.
11. The installation of gas mains from the intersection of
Fitchburg Avenue and Maitland Drive southeasterly along
Maitland Drive to Harbor Bay Parkway as described in 1 above
a distance of 1,200 feet together with structures and
appurtenances to provide a functional gas main system.
12. The installation and /or construction of water mains at the
intersection of the Harbor Bay Parkway and Maitland Drive
connect to Harbor Bay Parkway as uescribed in 1 above a
distance of 106 feet and the reconstruction and /or
replacement of water mains in Maitland Drive from 300 feet
south of Island Drive to Melrose; Avenue a distance of1800
feet together with the installation of services in Harbor Bay
Parkway as described in 1 above to install mains, valves,
tees, and upgrading of facilities and appurtenances to
provide an operative water system.
13. The installation of electric cable from Fitchburg Avenue
to Harbor Bay Parkway to connect to Harbor Bay Parkway as
described in 1 above including cable installations,
transformers and appurtenances.
14. The acquisition of all lands, easements, permits and licenses
and construction of all auxiliary work necessary to complete
the above described improvements.
The foregoing improvements shall be constructed in accordance with
all applicable rules, regulations, standards and specifications
estalished by the appropriate public entity or regulated public
utility which upon completion of said improvements and acceptance
thereof, will own operate and maintain such improvements.
HARBOR BAY BUSINESS PARK ASSESSMENT DISTRICT 81 -1
EXHIBIT A