Resolution 09948CITY OF ALAMEDA RESOLUTION NO. 9948
ACCEPTING PROPOSAL AS AGREEMENT (L. S. MASON &
ASSOCIATES FOR STRUCTURAL REVIEW AND UNIFORM BUILDING
CODE PLAN CHECK OF BUILDINGS IN MARINA VILLAGE PROJECT
WHEREAS, five buildings located within the Marina Village
Project require substantial structural renovation; and
WHEREAS, the structural plan checking for these buildings
will be extensive and time consuming and would considerably con-
strain the City's Building Inspections Department review at this
time; and
WHEREAS, L. S. Mason & Associates, Consulting Engineers,
has submitted a proposal to provide the structural and U.D.C.
progress review and plan check for these five buildings;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF ALAMEDA that the proposal of L. S. Mason & Associates, dated
November 22, 1982, a copy of which is attached, for its services
for the structural plan check and U.B.C. review of five buildings
'coated in the Marina Village Project, is hereby accepted and
BE IT FURTHER RESOLVED that the City Manager is hereby
authorized to execute and accept, and the City Clerk to attest
to, said Proposal on behalf of the City; and
BE IT FURTHER RESOLVED that the cost, of said services shall
be reimbursed to the City in full by Vintage Properties - Alameda
Corporation as evidenced by its approval, attached to said proposal
as Exhibit A.
BE IT FURTHER RESOLVED that said Proposal and this
Resolution shall constitute the contract of the parties hereto.
L. S. MASON & ASSOCIATES
CONSULTING ENGINEERS
November 22, 1982
Mr. William Norden
Director of Public Works
City of Alameda
Building Inspection Department
Room 204, City Hall
Alameda, California 94501
RE: STRUCTURAL AND U.B.C. REVIEW
MARINA VILLAGE-PHASE 1
A. BETHLEHEM BUILDING RENOVATION
B. BUILDING A RENOVATION
C. PaTER HOUSE RENOVATION
D. NEW BUILDINGS B & E
Dear Mr. Norden,
C E 11
NOV -2 4 71,
PUB:JO WORK DEPT.
CITY 07 ALAMEDA
Thank you for the opportunity to submit a proposal on the above project.
We shall provide the structural and U.B.C. progress review and plan
check for this project, but not to include plumbing, mechanical, and
electrical review or state energy conservation compliance. The City
of Alameda should state which issue of the U.B.C. is to be used for
this project.
We have structured our proposal in two parts:
1. Periodic design review and consultations: This work
will generally consist of meetings with the Architect
and/or Engineer as requested by them for review of the
design. There also may be some time required to re-
view or analyze a design approach as requested by the
Architect or Engineer.
We propose to do this work on a time and material basis.
It is difficult to estimate the amount of involvement
we would have in this phase of the work. We suggest
that you budget $ 4,000.00 for this work. We have attach-
ed our fee schedule, which shall be valid for this project
thru December 31, 1983.
If the budget figure is being approached, we will notify
your office as to that fact.
2. Plan check of the completed design project as noted below.
We propose to do this work on a time and material basis.
(See attached fee schedule). Based upon the following
construction cost estimates, we suggest that you budget
the fee estimates noted for each portion of the project.
935 MORAGA ROAD, SUITE 202 / LAFAYETTE, CA 94549 / TELEPHONE (415) 283-8805
Mr. William Nordeu
City of Alameda
A. Bethlehem Building Renovation
enclosing four separate living
unit structures built on a
raised concrete poduim.
lh5'+ s 575'+
ESTIMATED ESTIMATED
PROJECT COST PLAN CHECK [BE
$15,0O0'0(X)+ $12'000-15.000
B. Concrete Building A-
Renovate 5 story-change
from warehouse to office
occupancy with some
structural renovations
230'+ x 95' $ 6'000.000+ $ 4'500-6,000
C. Power house Renovation
llZ'+ x 54' 600.000+ $ 600+
U. New Buildings
1]'}00+ S.F. $ 800'000~ $ 800+
E. New Building E
2'400+ S.F.
$ 1\0,0U0+ � 200+
We applied the U.D.C. (1979) plan check [c, schedule to the
project cost estimates to get the building permit [,,s and
hz,,d upon our experience in plan checking, we estimate that
the structural and U.D.C. plan checking takes about 5() to 607,
of these amounts.
Billing and payment of bi lls to be monthly, based on completion of our
worIL
We trust the above meets your requirements and we look forward to work-
ing with your office.
Sincerely,
^/'
/
Scott G. Simmons
Associate
',/mw
attachment
ACCEPTED BY DATE
L. S. MASON & ASSOCIATES CONSULTING ENGINEERS
L. S. MASON & ASSOCIATES
CONSULTING ENGINEERS
L.S. MASON & ASSOCIATES
FEE SCHEDULE
PRINCIPAL $ 60.00
ASSOCIATE 50.00
STAFF ENGINEER 40.00
SENIOR DRAFTSMAN 35.00
DRAFTSMAN 30.00
SECRETARY 15.00
TRAVEL 0.22/MILE
REPRODUCTION COST = 10%
*Effective until December 31, 1983
Alameda Marina Village
935 MORAGA ROAD, SUITE 202 / LAFAYETTE, CA 94549 / TELEPHONE (415) 283-8805
DEC
+1•,,
CITY (DE ALA 14
December 2, 1982
Mr. Bill Norton
Director of Public Works
City of Alameda
City Hall
Santa Clara Avenue at Oak Street
Alameda, CA 94501
Dear Bill:
We are in receipt of a proposal from L.S. Mason and Asso-
ciates, Consulting Engineers, to provide the structural rev;ew
and UBC plan check for several buildings in our Marina Village
project. We have reviewed the proposal and accept the scope
of work and proposed fees, which we understand are on a time
and materials basis up to a maximum guaranteed price. We
hereby agree to reimburse the City of Alameda for the fees
quoted in Mason's proposal up to the guaranteed maximum price
quoted. It is our understanding that their review and plan
check will act as the Building Department's review of our
construction docuements for the following projects: 1) the
Bethlehem Building renovation; 2) Building A renovation; 3)
the Power House renovation; and 4) new buildings referred to
as Building B and Building E.
In the near future we plan to consult with Mason at the
schematic level of our building plans in order to get an
interpretation that we are complying with the UBC structural
interpretation. This will allow us to proceed into design
development and working drawings, knowing that we are in
compliance with Alameda's interpretation of the code, and
thereby minimize the eventuality of having to redesign thc
project at the working drawing level.
VINThGE PROPERTIES 3000 SAND HILL ROD • BUILDING 3 • SUITE 255 • ME "AR:,.CALIFORNUk 0 4025 (415).854-5681
Mr. Bill Norton
December 2, 1982
Page Two
Our signature below indicates our approval of L.S. Mason's fee
proposal and assures the City of reimbursement by Alameda Home
Builders of fees incurred for plan review.
Very truly yours,
ALAMEDA HOME BUILDERS
By
Vintage Properties - Alameda
Corporation
e20-A_ !14/ec
By
Don Parker
DP:kc
cc: John Erving
Dave Reinker
Bruce Beard
Scott Simmons
I, the undersigned, hereby certify that the foregoing Resolution
was duly and regularly adopted and passed by the Council of the
City of Alameda in regular meeting assembled on the 21st of December, 1982,
by the following vote to wit:
AYES: Councilmen Diament^ Gorman, Sherratt, Stone and President Corica - 5.
NOES: None.
ABSENT: None,
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official
seal of said City this 22nd day of December, 1982.