Loading...
Resolution 11665CITY OF ALAMEDA RESOLUTION NO. 11665 AUTHORIZING APPROPRIATION OF FUNDS FROM THE GOLF COURSE ENTERPRISE ACCOUNT TO FUND TEST DRILLING FOR A NEW WELL AT THE GOLF COMPLEX WHEREAS, for over twenty years the golf course turf was irrigated exclusively by water from two wells at the golf complex; and WHEREAS, beginning in 1984, due to increased salt content in the well water, a mixture of East Bay Municipal Utility District (E.B.M.U.D.) potable water had to be used to dilute the salt content sufficiently to make it safe for irrigation purposes; and WHEREAS, on June 1, 1988, E.B.M.U.D. imposed a District- wide water rationing program which cut the allocation of potable water at the golf course by 50% over the monthly consumption rate of 1986 and increased the rate and penalized water consumption over the 50% allocated; and WHEREAS, because of the restrictions imposed by E.B.M.U.D., alternative water sources for irrigating of the golf course have been explored that would reduce the need of water from E.B.M.U.D.; and WHEREAS, the Golf Commission and staff have determined that said alternate water source can be achieved by drilling a new well at the golf course; and WHEREAS, to assure that the content and quality of water will be satisfactory for irrigation purposes, it has been determined that a test boring process which includes the following should be performed: 1) mobilization and demobilization of equipment; 2) test hole drilling up to 1000 feet; and 3) electric logging of test boring; and WHEREAS, proposals for said process were requested with the lowest of three proposals, submitted by Maggora Bros. Drilling, Inc., from Hollister, California, costing approximately $12,000 (an actual figure cannot be provided because there is no way to know how deep the hole will have to be drilled); and WHEREAS, if the first hole does not reflect satisfactory results, it is recommended that while the equipment is on site a second test hole be drilled in a different location at an estimated cost of $11,000; and WHEREAS, funds to cover costs of drilling the first hole can be provided by savings in the current 1988-89 budget through conservative fiscal management; NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Alameda that the test drilling to establish the feasibility for construction of a new future well at the golf course is hereby approved, the proposal from Maggora Bros. Drilling, Inc. to perform said work is hereby accepted, and the sum of $11,000 is hereby appropriated from the Golf Course Enterprise fund balance to fund drilling of a second test hole if required. I, the undersigned, hereby certify that the foregoing Resolution was duly and regularly adopted and passed by the Council of the City of Alameda in regular meeting assembled on the 21st of February, 1989, by the following vote to wit: AYES: NOES: Councilmembers Arnerich, Camioia, Monsef, Thomas and President Corica - 5. None. ABSENT: None. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of said City this 22nd day of February, 1989.