Loading...
Resolution 14869CITY OF ALAMEDA RESOLUTION NO. 14869 AMENDING MASTER FEE RESOLUTION NO. 12191 TO REVISE THE FEE SCHEDULES FOR THE COMMUNITY DEVELOPMENT (PLANNING AND BUILDING), PUBLIC WORKS, AND FIRE DEPARTMENTS WHEREAS, the Alameda Municipal Code and the California Government Code provide that the City Council shall set fees reasonable to recover the cost of providing various services by resolution; and WHEREAS, the City Council, at the August 27, 1991 Special Council meeting, directed City staff to amend the Alameda Municipal Code to reflect that City fees shall be set by City Council Resolution; and WHEREAS, Resolution No. 12191 (“Master Fee Resolution”) as amended, codifies existing fees for various City services and permits; and WHEREAS, State law authorizes local governments to charge fees for services based on the estimated reasonable cost of providing the service for which the fee is charged; and WHEREAS, the Planning and Building Divisions of the Community Development Department are budgeted out of a special revenue fund where all expenditures are covered 100% by development related fees; and WHEREAS, Permit applications and fees fluctuate year to year based on market conditions; and WHEREAS, with the recent slow economy the Planning and Building Divisions expenses exceeded revenue by an average of $230,000 per year over the last three years, thereby reducing the previously established reserve by nearly $700,000; and WHEREAS, the Planning and Building Divisions of the Community Development Department have a need to maintain a core staffing level in order to service approved permits and entitlements and be ready to respond to the possibility of a sudden increase in workload due to earthquakes or other natural disasters, the reasonable fees for Planning and Building activities include the establishment and maintenance of a 90 day core staffing level fund. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Alameda that fees for various City services and permits are set forth in the attached Exhibit “A”. BE IT FURTHER RESOLVED that all fees established by Master Fee Resolution 12191 which are inconsistent with fees established by this Resolution are hereby repealed. * * * * * * CITY OF ALAMEDA MASTER FEE SCHEDULE Table of Contents FEE SCHEDULE PAGE Schedule of Building Department Fees 2-12 Plan Check 2-3 Inspection 4-5 Total (Plan Check & Inspection)6-7 Miscellaneous 8-9 Mechanical, Plumbing, Electrical 10-12 Schedule of Planning Department Fees 13-16 Schedule of Public Works Department Fees 17-24 Schedule of Fire Department Fees 25-31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Plan Check FIRE RATING LEVEL OF EFFORT MODIFIER Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$3,547$0.51$2,365$0.34$1,892$0.27 5,000 per project$5,067$0.35$3,378$0.24$2,703$0.19 10,000 per project$6,841$0.24$4,561$0.16$3,649$0.13 25,000 per project$10,388$0.13$6,926$0.09$5,540$0.07 50,000 per project$13,682$0.27$9,121$0.18$7,297$0.15 Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage:per project 2,000 per project$2,280$0.42$1,520$0.28$1,216$0.23 5,000 per project$3,547$0.20$2,365$0.14$1,892$0.11 10,000 per project$4,561$0.15$3,040$0.10$2,432$0.08 25,000 per project$6,841$0.09$4,561$0.06$3,649$0.05 50,000 per project$9,121$0.18$6,081$0.12$4,865$0.10 Low and Moderate Hazard Storage - (All newly constructed or added space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$1,013$0.17$676$0.11$541$0.09 5,000 per project$1,520$0.10$1,013$0.07$811$0.05 10,000 per project$2,027$0.07$1,351$0.05$1,081$0.04 25,000 per project$3,040$0.04$2,027$0.03$1,622$0.02 50,000 per project$4,054$0.08$2,703$0.05$2,162$0.04 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) Square Footage: 2,000 per project$2,280$0.42$1,520$0.28$1,216$0.23 5,000 per project$3,547$0.20$2,365$0.14$1,892$0.11 10,000 per project$4,561$0.15$3,040$0.10$2,432$0.08 25,000 per project$6,841$0.09$4,561$0.06$3,649$0.05 50,000 per project$9,121$0.18$6,081$0.12$4,865$0.10 Commercial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$1,520$0.25$1,013$0.17$811$0.14 5,000 per project$2,280$0.15$1,520$0.10$1,216$0.08 10,000 per project$3,040$0.10$2,027$0.07$1,622$0.05 25,000 per project$4,561$0.06$3,040$0.04$2,432$0.03 50,000 per project$6,081$0.12$4,054$0.08$3,243$0.06 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non- residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$1,267$0.17$845$0.11$676$0.09 5,000 per project$1,774$0.10$1,182$0.07$946$0.05 10,000 per project$2,280$0.08$1,520$0.06$1,216$0.05 25,000 per project$3,547$0.04$2,365$0.03$1,892$0.02 50,000 per project$4,561$0.09$3,040$0.06$2,432$0.05 Occupancy Type and Class Fee Unit 1.501.251 Fire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB Fire Rating Type I, II City of Alameda Master Fee Schedule Building Fees - PC 2 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Plan Check FIRE RATING LEVEL OF EFFORT MODIFIER Occupancy Type and Class Fee Unit 1.501.251 Fire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB Fire Rating Type I, II Single Family Dwellings - (All newly constructed space for residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project) Square Footage: 1,000 per project$2,027$0.68$1,351$0.45$1,081$0.36 2,500 per project$3,040$0.68$2,027$0.45$1,622$0.36 4,000 per project$4,054$0.51$2,703$0.34$2,162$0.27 6,000 per project$5,067$0.51$3,378$0.34$2,703$0.27 8,000 per project$6,081$0.76$4,054$0.51$3,243$0.41 Residential Repeat / Subsequent Lot Plan Checkper project$270 N/A $270 N/A $270 N/A Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$1,013$1.27$676$0.84$541$0.68 600 per project$1,520$1.27$1,013$0.84$811$0.68 1,000 per project$2,027$2.03$1,351$1.35$1,081$1.08 1,500 per project$3,040$2.03$2,027$1.35$1,622$1.08 2,000 per project$4,054$2.03$2,703$1.35$2,162$1.08 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non- structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$507$0.63$338$0.42$270$0.34 600 per project$760$0.63$507$0.42$405$0.34 1,000 per project$1,013$1.01$676$0.68$541$0.54 1,500 per project$1,520$1.01$1,013$0.68$811$0.54 2,000 per project$2,027$1.01$1,351$0.68$1,081$0.54 City of Alameda Master Fee Schedule Building Fees - PC 3 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Inspection FIRE RATING LEVEL OF EFFORT MODIFIER Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$2,534$0.42$1,689$0.28$1,351$0.23 5,000 per project$3,801$0.25$2,534$0.17$2,027$0.14 10,000 per project$5,067$0.14$3,378$0.09$2,703$0.07 25,000 per project$7,094$0.12$4,730$0.08$3,784$0.06 50,000 per project$10,135$0.20$6,757$0.14$5,405$0.11 Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage:per project 2,000 per project$3,801$1.27$2,534$0.84$2,027$0.68 5,000 per project$7,601$2.03$5,067$1.35$4,054$1.08 10,000 per project$17,736$0.64$11,824$0.43$9,459$0.34 25,000 per project$27,364$0.12$18,243$0.08$14,594$0.06 50,000 per project$30,405$0.61$20,270$0.41$16,216$0.32 Low and Moderate Hazard Storage - (All newly constructed or added space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$2,534$1,689$1,351 5,000 per project$2,534$0.25$1,689$0.17$1,351$0.14 10,000 per project$3,801$0.08$2,534$0.06$2,027$0.05 25,000 per project$5,067$0.05$3,378$0.03$2,703$0.03 50,000 per project$6,334$0.13$4,223$0.08$3,378$0.07 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) Square Footage: 2,000 per project$2,534$1,689$1,351 5,000 per project$2,534$0.25$1,689$0.17$1,351$0.14 10,000 per project$3,801$0.08$2,534$0.06$2,027$0.05 25,000 per project$5,067$0.05$3,378$0.03$2,703$0.03 50,000 per project$6,334$0.13$4,223$0.08$3,378$0.07 Commercial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$2,534$0.42$1,689$0.28$1,351$0.23 5,000 per project$3,801$0.15$2,534$0.10$2,027$0.08 10,000 per project$4,561$0.03$3,040$0.02$2,432$0.02 25,000 per project$5,067$0.05$3,378$0.03$2,703$0.03 50,000 per project$6,334$0.13$4,223$0.08$3,378$0.07 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non- residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$2,027$0.34$1,351$0.23$1,081$0.18 5,000 per project$3,040$0.15$2,027$0.10$1,622$0.08 10,000 per project$3,801$0.05$2,534$0.03$2,027$0.03 25,000 per project$4,561$0.03$3,040$0.02$2,432$0.02 50,000 per project$5,321$0.11$3,547$0.07$2,838$0.06 1.501.251 Occupancy Type and Class Fee Unit Fire Rating Type I, IIFire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB City of Alameda Master Fee Schedule Building Fees - Insp. 4 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Inspection FIRE RATING LEVEL OF EFFORT MODIFIER1.501.251 Occupancy Type and Class Fee Unit Fire Rating Type I, IIFire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB Single Family Dwellings - (All newly constructed space for residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project) Square Footage: 1,000 per project$3,801$2,534$2,027 2,500 per project$3,801$0.84$2,534$0.56$2,027$0.45 4,000 per project$5,067$0.63$3,378$0.42$2,703$0.34 6,000 per project$6,334$0.38$4,223$0.25$3,378$0.20 8,000 per project$7,094$0.89$4,730$0.59$3,784$0.47 Residential Repeat / Subsequent Lot Plan Checkper project - N/A - N/A - N/A Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$1,267$1.90$845$1.27$676$1.01 600 per project$2,027$1.27$1,351$0.84$1,081$0.68 1,000 per project$2,534$1.01$1,689$0.68$1,351$0.54 1,500 per project$3,040$1.52$2,027$1.01$1,622$0.81 2,000 per project$3,801$1.90$2,534$1.27$2,027$1.01 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non- structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$760$1.27$507$0.84$405$0.68 600 per project$1,267$1.90$845$1.27$676$1.01 1,000 per project$2,027$1.01$1,351$0.68$1,081$0.54 1,500 per project$2,534$1.01$1,689$0.68$1,351$0.54 2,000 per project$3,040$1.52$2,027$1.01$1,622$0.81 City of Alameda Master Fee Schedule Building Fees - Insp. 5 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Total FIRE RATING LEVEL OF EFFORT MODIFIER Commercial Uses - Structural (All newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$6,081$0.93$4,054$0.62$3,243$0.50 5,000 per project$8,868$0.61$5,912$0.41$4,730$0.32 10,000 per project$11,909$0.37$7,939$0.25$6,351$0.20 25,000 per project$17,483$0.25$11,655$0.17$9,324$0.14 50,000 per project$23,817$0.48$15,878$0.32$12,702$0.25 Commercial Residential and Multifamily Residential Uses - (All newly constructed or added space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage:per project 2,000 per project$6,081$1.69$4,054$1.13$3,243$0.90 5,000 per project$11,148$2.23$7,432$1.49$5,946$1.19 10,000 per project$22,297$0.79$14,865$0.53$11,892$0.42 25,000 per project$34,205$0.21$22,804$0.14$18,243$0.11 50,000 per project$39,526$0.79$26,351$0.53$21,081$0.42 Low and Moderate Hazard Storage - (All newly constructed or added space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 2,000 per project$3,547$0.17$2,365$0.11$1,892$0.09 5,000 per project$4,054$0.35$2,703$0.24$2,162$0.19 10,000 per project$5,828$0.15$3,885$0.10$3,108$0.08 25,000 per project$8,108$0.09$5,405$0.06$4,324$0.05 50,000 per project$10,388$0.21$6,926$0.14$5,540$0.11 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed or added space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) Square Footage: 2,000 per project$4,814$0.42$3,209$0.28$2,568$0.23 5,000 per project$6,081$0.46$4,054$0.30$3,243$0.24 10,000 per project$8,361$0.24$5,574$0.16$4,459$0.13 25,000 per project$11,909$0.14$7,939$0.09$6,351$0.08 50,000 per project$15,456$0.31$10,304$0.21$8,243$0.16 Commercial Tenant Improvement - Structural - (Structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$4,054$0.68$2,703$0.45$2,162$0.36 5,000 per project$6,081$0.30$4,054$0.20$3,243$0.16 10,000 per project$7,601$0.14$5,067$0.09$4,054$0.07 25,000 per project$9,628$0.11$6,419$0.07$5,135$0.06 50,000 per project$12,415$0.25$8,277$0.17$6,621$0.13 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non- residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) Square Footage: 2,000 per project$3,294$0.51$2,196$0.34$1,757$0.27 5,000 per project$4,814$0.25$3,209$0.17$2,568$0.14 10,000 per project$6,081$0.14$4,054$0.09$3,243$0.07 25,000 per project$8,108$0.07$5,405$0.05$4,324$0.04 50,000 per project$9,882$0.20$6,588$0.13$5,270$0.11 1.501.251 Occupancy Type and Class Fee Unit Fire Rating Type I, IIFire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB City of Alameda Master Fee Schedule Building Fees - Total 6 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fees Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Base CostCost Per S.F. Between Thresholds Cost/s.f. Fee Tables for New Construction, Additions and Major Remodels - Total FIRE RATING LEVEL OF EFFORT MODIFIER1.501.251 Occupancy Type and Class Fee Unit Fire Rating Type I, IIFire Rating Type IIA, III, IVA Fire Rating Type IIB, IIB, IV, VB Single Family Dwellings - (All newly constructed space for residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule. This category includes the model home or a custom home project) Square Footage: 1,000 per project$5,828$0.68$3,885$0.45$3,108$0.36 2,500 per project$6,841$1.52$4,561$1.01$3,649$0.81 4,000 per project$9,121$1.14$6,081$0.76$4,865$0.61 6,000 per project$11,402$0.89$7,601$0.59$6,081$0.47 8,000 per project$13,175$1.65$8,784$1.10$7,027$0.88 Residential Repeat / Subsequent Lot Plan Checkper project$270 n/a $270 n/a $270 n/a Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$2,280$3.17$1,520$2.11$1,216$1.69 600 per project$3,547$2.53$2,365$1.69$1,892$1.35 1,000 per project$4,561$3.04$3,040$2.03$2,432$1.62 1,500 per project$6,081$3.55$4,054$2.36$3,243$1.89 2,000 per project$7,855$3.93$5,236$2.62$4,189$2.09 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non- structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) Square Footage: 200 per project$1,267$1.90$845$1.27$676$1.01 600 per project$2,027$2.53$1,351$1.69$1,081$1.35 1,000 per project$3,040$2.03$2,027$1.35$1,622$1.08 1,500 per project$4,054$2.03$2,703$1.35$2,162$1.08 2,000 per project$5,067$2.53$3,378$1.69$2,703$1.35 City of Alameda Master Fee Schedule Building Fees - Total 7 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Itemized Fee Tables for Minor Commercial and Residential Improvements Standard Hourly Rateper hour68$ 68$ 135$ Permit Center Processing Fee - Standardeach45$ -$ 45$ Permit Center Processing Fee - Web Based Permiteach23$ -$ 23$ Minimum Building Permit Fees - Set by Policy Minimum Building Permit Fee (over the counter) Projects valued at < $1,000each68$ 68$ 135$ Projects valued at $1,001 - $2,500each68$ 101$ 169$ Projects valued at $2,501 - $4,999each68$ 135$ 203$ Minimum Combination Permit Fee (over the counter) Projects valued at < $1,000each trade68$ 135$ 203$ Projects valued at $1,001 - $2,500each trade68$ 203$ 270$ Projects valued at $2,501 - $4,999each trade68$ 270$ 338$ Accessory and Utility Uses (U Occupancy) 500 s.f. or lesseach 541$ 811$ 1,351$ 501 s.f. or moreeach811$ 811$ 1,622$ Antenna Equipment Shelter (All Trades)each811$ 203$ 1,013$ Cellular/Mobile Phone (All Trades)each541$ 608$ 1,149$ Awning/Canopyeach270$ 101$ 372$ Carporteach405$ 304$ 709$ Certificate of Occupancy - Residentialeach-$ 101$ 101$ Certificate of Occupancy - Commercialeach-$ 101$ 101$ Close Existing Openingseach-$ 101$ 101$ Commercial Trailereach unit270$ 203$ 473$ Deck - ground flooreach135$ 203$ 338$ Deck - second story and aboveeach270$ 203$ 473$ Demolitioneach135$ 304$ 439$ Duplicate/Replacement Job Cardeach45$ -$ 45$ Fence or Freestanding Wall (light frame) > six feet in heightup to 100 l.f..270$ 101$ 372$ Each additional l.f.each 100 l.f..-$ 34$ 34$ Fence or Freestanding Wall (masonry or concrete) > four feet in heightup to 100 l.f..405$ 304$ 709$ Each additional l.f.each 100 l.f..-$ 68$ 68$ Fireplace Masonryeach270$ 405$ 676$ Pre-fabricated/Metaleach270$ 304$ 574$ Flag Poleeach270$ 203$ 473$ Garage (All Trades) Light Frame up to 1,000 s.f.each811$ 608$ 1,419$ Masonry or concrete up to 1,000 s.f.each1,081$ 709$ 1,791$ Greenhouse (non-commercial) (All Trades)each541$ 203$ 743$ Light Pole (All Trades)each135$ 203$ 338$ Each additional poleeach-$ 101$ 101$ Partition - Commercial, Interior up to 30 l.f.up to 30 l.f..135$ 304$ 439$ Each additional 30 l.f.each 30 l.f..-$ 101$ 101$ Partition - Residential, interioreach135$ 304$ 439$ Patio Cover Open, all typesup to 300 s.f.270$ 203$ 473$ Additional open covereach 300 s.f.135$ -$ 135$ Enclosed, all typesup to 300 s.f.405$ 270$ 676$ Additional enclosed covereach 300 s.f.135$ 101$ 236$ Photovoltaic System (Commercial) (All Trades) City to insert KW based thresholds / fee structure here each541$ 1,081$ 1,622$ Photovoltaic System (Residential) (All Trades)each235$ 265$ 500$ Photovoltaic System (Residential) (All Trades) - when applicant submits using East Bay Green Corridor's submittal package each118$ 132$ 250$ Piles or Pier/Pile Foundations Cast in place Concrete (1st 10 piers)up to 10541$ 405$ 946$ Additional Piers (each 10)up to 10-$ 405$ 405$ Driven (steel, pre-stressed concrete, helical)up to 10541$ 270$ 811$ Additional Piles (each 10)each 100 l.f..-$ 68$ 68$ Pre-Plan Inspection (first hour)each Each additional hourper hour-$ 135$ 135$ Retaining Wall/Foundation Repair and Replacement First 50 l.f.up to 50 l.f..135$ 608$ 743$ Each additional 50 l.f.each 50 l.f..-$ 68$ 68$ TotalFee DescriptionFee Unit PC / Processing Inspection City of Alameda Master Fee Schedule Misc Items Fee Tables 8 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Itemized Fee Tables for Minor Commercial and Residential Improvements TotalFee DescriptionFee Unit PC / Processing Inspection Re-Roofeach-$ 101$ 101$ Re-Roof with Sheathingeach-$ 203$ 203$ Roof Structure Replacement (Residential)up to 1500 s.f.405$ 304$ 709$ Each additional 500 s.f.each 500 s.f.-$ 101$ 101$ Sauna - Steameach203$ 405$ 608$ Seismic Retrofit/Strengthening (Residential) up to 100 l.f..270$ 304$ 574$ Each additional 100 l.f.each 100 l.f..135$ -$ 135$ Seismic Retrofit/Strengthening per ABAG Plan or 2006 IEBCeach68$ 405$ 473$ Signs (All Trades) Wall Mountedeach135$ 101$ 236$ Monumenteach135$ 203$ 338$ Soft Story Report Revieweach750$ -$ 750$ Skylight Less than 10 s.f.each135$ 203$ 338$ Greater than 10 s.f. or structuraleach135$ 304$ 439$ Spa or Hot Tubeach135$ 304$ 439$ Special Events Permit Coordinationeach405$ -$ 405$ Stairs - First Flightfirst flight541$ 304$ 845$ Each Additional Flightper flight135$ 101$ 236$ Storage Racksfirst 100 l.f..135$ 101$ 236$ Each Additional 100 l.f.each 100 l.f..-$ 101$ 101$ Swimming Pool/Spa (All Trades) Pre-fabricatedeach270$ 507$ 777$ Custom-builteach541$ 709$ 1,250$ Commercial Pooleach811$ 946$ 1,757$ Termite Report/Dry rot Repairseach-$ 507$ 507$ Window or Door Replacementup to 5-$ 203$ 203$ Additional Replacementeach 5-$ 101$ 101$ New Window (requires structural)up to 5405$ 507$ 912$ Additional New Windoweach 5135$ -$ 135$ Deferred Submittal Plan Check Fee (minimum time - 2 hrs)hourly (min 2 hrs.)270$ -$ 270$ Overtime Plan Check Feeper hour135$ -$ 135$ Supplemental Inspection Fee (per 1/2 hour or portion thereof)per 1/2 hour-$ 68$ 68$ Supplemental Plan Review (per 1 hour or portion thereof)per hour135$ -$ 135$ Board of appealseach270$ 68$ 338$ After-hours or Emergency Call-Out hourly (min 2 hrs.)-$ 135$ 135$ City of Alameda Master Fee Schedule Misc Items Fee Tables 9 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fee Description Fee Unit PC / ProcessingInspectionTotal Itemized Fee Tables for Mechanical, Plumbing, and Electrical Permits (not part of a larger building permit) Permit Processing / Filing Fee - Standardper project 45$ -$ 45$ Permit Processing / Filing Fee - Web-based Permitper project 23$ -$ 23$ Plan Review per hour 135$ -$ 135$ Simple Project Inspection (includes up to 3 items marked as "Simple in the following list of project types): per project -$ 203$ 203$ Simple project Inspection - each additional item after 3 45$ 45$ Complex Project Inspection (per individual item marked as "Complex" in the following list of project types:) per project Other Mechanical, Plumbing, or Electrical Inspections not otherwise listed belowper hour -$ 101$ 101$ -$ -$ -$ Mechanical Permit Fees -$ -$ -$ Install/Relocate each forced air or gravity-type furnace or burner (including attached ducts and vents) up to and including 100,000 Btu/hr Complex -$ 203$ 203$ Repair/alteration/addition to each heating appliance, refrigeration unit, cooling unit, absorption unit or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by code. Simple Install, relocate each boiler or compressor, up to and including 3 HP, or each absorption system up to and including 100,000 Btu/hr Complex -$ 203$ 203$ Each air-handling unit, including attached ducts. (Note: this fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere Complex -$ 304$ 304$ Each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit. Simple Residential - installation of each hood which is served by mechanical exhaust, including the ducts for such hood Simple Commercial - installation of each hood which is served by mechanical exhaust, including the ducts for such hood Complex 405$ 507$ 912$ Each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in the code Simple Plumbing and Gas Permit Fees Each plumbing fixture or trap or set of fixtures on one trap (including water, drainage, piping, and backflow protection therefore) Simple Each building sewerSimple Each water heater and/or ventSimple Each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps Complex -$ 405$ 405$ Installation, alteration, or repair of water piping and/or water treating equipmentSimple Installation, alteration, or repair of gas piping and/or gas treating equipmentSimple City of Alameda Master Fee Schedule Building Fees - MPE 10 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fee Description Fee Unit PC / ProcessingInspectionTotal Itemized Fee Tables for Mechanical, Plumbing, and Electrical Permits (not part of a larger building permit) Repair or alteration of drainage or vent pipingSimple Each lawn sprinkler system on any one meter, including backflow protection devices Simple Backflow devices not included in other fee services (e.g., building sewer) each unitSimple Gas test Simple Sewer lateral test Simple Electrical Permit Fees Swimming Pools Private, residential, in-ground swimming pools - includes a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool Complex 270$ 709$ 980$ All other types of swimming pools, therapeutic whirlpools, spas, and alterations to existing swimming pools Simple Temporary Power Service Temporary service power pole or pedestal, including all pole or pedestal-mounted receptacle outlets and appurtenances Simple Temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lighting, Christmas tree sales lots, etc. Complex -$ 101$ 101$ 15 or 20 amp - first 10 circuitsSimple over 10 circuitsSimple 25 to 40 amp circuitsSimple 50 to 175 amp circuitsSimple Receptacle, Switch and Lighting Outlets Receptacle, switch and lighting outlets at which current is used or controlled, except services, feeders and meters First 10 (or portion thereof)Simple Each additional 10 (or fraction thereof)Simple Residential Appliances Fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens, counter mounted cooking tops, electric ranges, self-contained room console or through-wall air conditioners, space heaters, food waste grinders, dishwashers, washing machines, water heaters, clothes dryers, or other motor- operated appliances not exceeding one horsepower (HP) in rating. Simple City of Alameda Master Fee Schedule Building Fees - MPE 11 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Permit Processing and Inspection Fee Description Fee Unit PC / ProcessingInspectionTotal Itemized Fee Tables for Mechanical, Plumbing, and Electrical Permits (not part of a larger building permit) Non-residential Appliances Residential appliances and self-contained factory-wired nonresidential appliances, including medical and dental devices, food, beverage, and ice cream cabinets; illuminated show cases, drinking fountains, vending machines, laundry machines, or other Simple Power Apparatus Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus, as follows: Note: these fees include all switches, circuit break Simple Busways Trolley and plug-in-type busways - each 100 l.f. or fraction thereof (An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in type busways. No fee is required for portable tools. Simple Signs, Outline Lighting, and Marquees Signs, Outline Lighting, or Marquees supplied from one branch circuitSimple Additional branch circuits within the same sign, outline lighting system or marqueeSimple New Services or Additional Panels Services Note: An additional fee of $105 (underground) or $150 (overhead) is due to Alameda Municipal Power for reconnection or upgrade of any service 600 volts or less and not over 200 amperes in ratingComplex 68$ 135$ 203$ 600 volts or less and over 200 amperes in ratingComplex 68$ 203$ 270$ 600 volts or over 1,000 amperes in ratingComplex 68$ 405$ 473$ Miscellaneous Apparatus, Conduits, and Conductors Simple Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is set forth. (This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs) City of Alameda Master Fee Schedule Building Fees - MPE 12 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Planning Cost Estimation for Providing Activities and Services Related to Permitting and Regulation Service Fee COMMUNITY DEVELOPMENT - PLANNING DIVISION FEES GENERAL PLAN AND ZONING APPLICATIONS AMENDMENTS Amendments - General Plan diagram or text Deposit $4,000; Actual Costs[1e] Amendments - to text of Chapter 30 "Development Regulations"/Zone Map Deposit $2,500; Actual Costs[1c] MASTER PLAN Master Plan / Amendment Deposit $5,000 Actual Cost[1f] PLANNED DEVELOPEMNT New/Amended Planned Development Deposit $7,000 Actual Cost[1g] DEVELOPMENT AGREEMENT Development Agreement Deposit $5,000 Actual Cost[1f] Periodic Review of Development Agreement$793 VARIANCE Variance - Zoning Administrator$1,428 Variance $1,904 USE PERMIT Use Permit - Zoning Administrator$1,428 [2] Use Permit (with no change in occupancy per Building Code)$1,904 [2] Use Permit (with change in occupancy per Building Code) Deposit $2,500 Actual Cost[1c] City of Alameda Master Fee Schedule Planning Fees 13 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Planning Cost Estimation for Providing Activities and Services Related to Permitting and Regulation Service Fee COMMUNITY DEVELOPMENT - PLANNING DIVISION FEES Modification to existing Use Permit (ex. Cell Site/Tower)$1,269 [2] DESIGN REVIEW Design Review - Exempt $79 [2] Design Review - No change in building footprint$476 [2] Design Review - Change in building footprint or new construction Deposit $3,000 Actual Cost[1d] SUBDIVISION APPLICATIONS TENTATIVE PARCEL MAP Tentative Parcel Map (up to 4 lots, including condo conversions) Deposit $5,000 Actual Cost[1f,4] Tentative Subdivision (Tract) Map (> 5 lots) Deposit $10,000 Actual Cost[1h] LOT LINE ADJUSTMENT Lot Line Adjustment (includes 2 reviews) Deposit $2,000 Actual Cost[1b,4] ENVIRONMENTAL Categorical Exemption $159 [2,3] Initial Study/ Negative Declaration/ EIR (plus additional deposit based on consultant estimate) Deposit $10,000 Actual Cost[1h,4] EXTENTION Extension - not vested (variance, design review, use permit,)$159 APPEALS City of Alameda Master Fee Schedule Planning Fees 14 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Planning Cost Estimation for Providing Activities and Services Related to Permitting and Regulation Service Fee COMMUNITY DEVELOPMENT - PLANNING DIVISION FEES Appeal to the City Council or Planning Board - Residential $250.00 + 500 Deposit Appeal to the City Council or Planning Board - Commericial$350.00 + 2,500 Deposit OTHER Design Review Team (DRT) - Preapplication review (Deposit) Deposit $2,500 Actual Cost[1c,2] Home Occupation $79 Zoning Compliance Determination$159 Zoning Clearance - Business License $0 Certificate of Compliance-Admin - OTC$79 Certificate of Compliance - Regulated Business$238 Deed Restriction $159 Performance Agreement Deposit $1,000 Actual Cost[1a] HISTORIC PRESERVATION Certificate of Approval by HAB Deposit $1,500 Actual Cost[1aa] Certificate of Approval by Staff $476 Historical Sign Designation $635 Changes in Historical Building Study List Classification Deposit $1,000 Actual Cost[1a] City of Alameda Master Fee Schedule Planning Fees 15 of 31 CITY OF ALAMEDA COMMUNITY DEVELOPMENT - Planning Cost Estimation for Providing Activities and Services Related to Permitting and Regulation Service Fee COMMUNITY DEVELOPMENT - PLANNING DIVISION FEES PLAN CHECK Planning - Final Building Plan Review/Inspection$159 [2] SIGN PERMITS Permanent Sign $238 [2] MISCELLANEOUS FEES Technology Fee 5% of permit [6] Records Mgmt Fee 1.4% of Permit [6] Community Planning Fee .5% of building valuation [6] Affordable Housing Agreement Fee Deposit $2,500 Actual Cost[1c] HOURLY RATE WITH OVERHEAD Planning Services $159 For services requested of City staff which have no fee listed in this fee schedule, the City Manager of the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. Notes [2] New Fee [3] Fee does not include County of Alameda Fee [4] Current Fee listed is for Planning only [1] Deposit Recommended [ 1a = $1,000; 1aa = $1,500; 1b = $2,000; 1c = $2,500; 1d = $3,000; 1e = $4,000; 1f = $5,000; 1g = $7,000; 1h = $10,000; 1i = $20,000 ]; plus may require additional Consultant Deposit based on Planner's Estimate; Fee is actual [5] Recommended policy for combination projects is to collect the deposit for each application as if it is a stand alone application; [6] Please refer to separate fee calculation for Technology Fee, Records Management Fee and Community Planning Fee City of Alameda Master Fee Schedule Planning Fees 16 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES Permit Issuance $68 [6] Copy Fee ($ .10 per copy per Public Records Act)$0.10 DVD/CD Copy $46 Final Map Review (Parcel or Tract)$6,469 [1e] Entitlement Review (ex. Easement, Dedication, Vacation, Abandonment)Deposit $2,000 Actual Cost [1c] TRANSPORTATION PERMIT (state law limits amount $16,$90) Per Trip $16 [3] Annual Permit $90 [3] PERMIT PARKING PROGRAM Establishment of Preferential Parking Zone (requires 40% of neighborhood residents and businesses for establishment) Deposit $5,000 Actual Cost [1e] Establishment of Preferential Parking Zone (requires 55% of neighborhood residents and businesses for establishment) - NO DEPOSIT $0 CITYWIDE DEVELOPMENT FEE PROGRAM Application to Public Works Director for Fee Adjustment Deposit $500 Actual Cost [1b] Appeal of Public Works Director's Decision $157 + Deposit as determined by the PW Director [1a] OTHER ENGINEERING SERVICES Assessment District Formation Deposit $10,000 Actual Cost [1f] RIGHT-OF-WAY PERMITS (Any work or encroachment within the Right-Of- Way requires a Right-Of-Way permit) ENCROACHMENT: TEMPORARY/SHORT TERM (Standard encroachment permit for all work other than concrete & excavation)$236 City of Alameda Master Fee SchedulePublic Works Fees 17 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES ENCOACHMENT: REVOCABLE/LONG TERM (Long Term Encroachments for a specific use such as outside/sidewalk café, planter box, box culverts, store fronts) Deposit $1,000 Actual Cost [1b] CONCRETE (Encroachment permit for concrete construction work, but no excavation) CONCRETE: CURB, GUTTER, SIDEWALK, CURB CORE Inspection Res - < 20 lin ft $157 Res - > 20 lin ft $314 Comm - < 150 lin ft $393 Comm - > 150 lin ft $707 CONCRETE: DRIVEWAY Residential SF $236 Commercial/Residential MF$550 EXCAVATION (Encroachment permit for excavation and any work covered by other encroachment permits, i.e. transverse & longitudinal trenches, street excavation work including surface restorations) EXCAVATION: PLANNED PROJECT OR UTILITY WORK (PER BLOCK, EACH BLOCK = 400 FT. MAX) Plan Review $314 [2] Traffic Control Review, typical$185 Traffic Control Review (per intersection)$370 Inspection Fee (Per Structure)$628 EXCAVATION: INDIVIDUAL SERVICE $628 City of Alameda Master Fee SchedulePublic Works Fees 18 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES EXCAVATION: MISCELLANEOUS STRUCTURES (e.g. manholes, storm water inlets, storm water outlets, electroilers, and underground vaults)[2] Plan Review $157 Traffic Control Review$157 Inspection fee per structure$628 ADDITIONAL INSPECTION AND TRAFFIC REVIEW (required for non-compliance w/written instructions from inspector applicable to all R-O-W permits) Inspection, per hour$157 Traffic Plan Review, per hour$157 IMPROVEMENT PLAN REVIEW PERMITS (ONSITE, OFFSITE, GRADING DEMOLITION) Pre-Engineering (For initial meeting) $314 [2] Pre-Engineering Traffic Review $314 [2] Supplemental Plan Check$314 [2] On site Res, MF Res > 5,000 sq ft Lot Size Deposit $2,500 Actual Cost [1d,2,4] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 reviews) (2,666)Deposit $1,000 Actual Cost [1b,2,4] Comm > 5,000 sq ft Lot Size (9,326)Deposit $2,500 Actual Cost [1d,2,4] Off site Res, MF Res > 5,000 sq ft Lot Size Deposit $10,000 Actual Cost [1f,2,4] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 reviews)Deposit $1,000 Actual Cost [1b,2,4] City of Alameda Master Fee SchedulePublic Works Fees 19 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES Comm > 5,000 sq ft Lot Size Deposit $10,000 Actual Cost [1f,2,4] Grading: (Onsite Grading, Excavation and Fills Res, MF Res > 5,000 sq ft Lot Size Deposit $1,000 Actual Cost [1b,2] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 reviews)Deposit $500 Actual Cost [1a,2] Comm > 5,000 sq ft Lot Size Deposit $1,000 Actual Cost [1b,2] Demolition (No Grading, No Installation Work) Res, MF Res > 5,000 sq ft Lot Size Deposit $1,000 Actual Cost [1b,2] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 reviews)Deposit $500 Actual Cost [1a,2] Comm > 5,000 sq ft Lot Size Deposit $1,000 Actual Cost [1b,2] IMPROVEMENT INSPECTION On site On site Res, MF Res > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2,5] On site Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 inspections)Deposit $1,000 Actual Cost [1b,2,5] On site Comm > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2,5] Off site Off site Res, MF Res > 5,000 sq ft Lot Size Deposit $10,000 Actual Cost [1f,2,5] Off site Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 inspections)Deposit $2,000 Actual Cost [1c,2,5] Off site Comm > 5,000 sq ft Lot Size Deposit $10,000 Actual Cost [1f,2,5] Grading (Offsite) City of Alameda Master Fee SchedulePublic Works Fees 20 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES Res, MF Res > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 inspections)Deposit $1,000 Actual Cost [1b,2] Comm > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2] Demolition (Offsite) Res, MF Res > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2] Comm < 5,000 sq ft Lot Size (1 bldg.; includes 2 inspections)Deposit $1,000 Actual Cost [1b,2] Comm > 5,000 sq ft Lot Size Deposit $5,000 Actual Cost [1e,2] REPORT REVIEW Geotechnical Report/Review Deposit $1,000 Actual Cost [1b,2] Sewer Report/Review Deposit $1,000 Actual Cost [1b,2] Storm Drain Report/Review Deposit $1,000 Actual Cost [1b,2] Surveyor Report/Review Deposit $1,000 Actual Cost [1b,2] Traffic Report/Review Deposit $1,000 Actual Cost [1b,2] OTHER PERMITS SEWER LATERAL PERMIT: LOWER LATERAL (one lower lateral per property) Sanitary Sewer Lower Lateral Installation (R-O-W)Deposit $2,500 Actual Cost [1d,2] SEWER LATERAL PERMIT: UPPER LATERAL - INDIVIDUAL Sewer Lateral Test (On-site)$193 [2] City of Alameda Master Fee SchedulePublic Works Fees 21 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES Private Sewer Lateral Repair/Replacement$193 [2] SEWER LATERAL PERMIT: UPPER LATERAL - HOA Sewer Lateral Test (On-site)$429 [2] Private Sewer Lateral Repair/Replacement$429 [2] CLEAN WATER REVIEW AND INSPECTION SWPPP INSPECTION Storm Water Pollution Prevention Plan (SWPPP) (applies to all development sites greater than 1 acre) (per wet season) Deposit $2,500 Actual Cost [1d,2] Clean Water Maintenance Agreement Review Deposit $2,500 Actual Cost [1d,2] Stormwater Mgmt Plan Review $628 [2] Review of Annual Mtce Reports of privately maintained post- construction treatment devices $314 [2] Inspection of privately maintained post-construction treatment devices $314 [2] Stormwater re-inspections $393 [2] PERMITS-SOLID WASTE & RECYCLING - HAULING FEES (C&D) Basic Fee (Annual) - review of non-franchise hauler to operate$786 Waste Management Plan (WMP) and Report review (online)$157 [2] Waste Management Plan (WMP) and Report review (paper)$314 [2] Reporting Fee $236 Penalty of failure to Meet required 50% Recycling goal (placeholder for MFS)[2] City of Alameda Master Fee SchedulePublic Works Fees 22 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES Program Fee (placeholder for MFS)[8] Impact Mitigation Fee (placeholder for MFS)[8] Performance Security Bond (placeholder for MFS)[8] STREET TREE INSTALLATION (trees, root box, fertilizer, stake & labor) 15 Gallon size trees$314 24" boxed trees $471 Street tree removal at property owner's request (varies depending on tree size)Deposit $5,000 Actual Cost [1e] Street Tree Installation - ** if concrete removal is required to install trees, an additional fee of $345 will be charged. This fee is based on four man hours to remove concrete, clear and dispose of debris) $628 * Arborist Report Deposit $5,000 Actual Cost [1e] OTHER No parking Signs for construction/events (1 sign per parking space or 18 feet of curb)$13 Curb Painting ($59 set up fee) - cost per each 100 linear foot$314 GENERAL SERVICES Research of Records (Non PRA)$157 Transportation Operational Requests-nonsafety related$471 Transportation Commission - Request for appeal of actions Deposit $1,000 Actual Cost [1b] Recycling/Trash Exception Application Deposit $1,000 Actual Cost [1b] City of Alameda Master Fee SchedulePublic Works Fees 23 of 31 CITY OF ALAMEDA PUBLIC WORKS Service Fee PUBLIC WORKS DEPARTMENT FEES HOURLY RATEs Engineering Services $157 Inspection Services $157 Environmental Services $157 For services requested of City staff which have no fee listed in this fee schedule, the City Manager of the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. Notes [6] Revenue collected and recorded in Permit Center (Building) [7] Eng costs only incl. [Costs to process planning applications is included with planning costs to recommend a fee based on total cost (including cross department support] [8] Placeholder for Master Fee Schedule (MFS) - Not Cost Based [1] Deposit Recommended [ 1a = $500; 1b = $1,000; 1c = $2,000; 1d = $2,500; 1e = $5,000; 1f = $10,000; 1g = $20,000 ]; plus may require additional Consultant Deposit based on Engineer's Estimate; Fee is actual cost [2] New Fee [3] Fee Limited by State Law [4] Improvement Plan Review - Current Fee collected by the Permit Center is combination building permit; fee listed on current fee schedule not used [5] Improvement Inspection - No current fee collected by the Permit Center for inspection; fee listed on current fee schedule not used City of Alameda Master Fee SchedulePublic Works Fees 24 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES Permit Issuance $68[2] Hazardous Materials Inspection Permit Fees (Category 1 and 2 New or Annual Permit) $282 Aerosol Products Flammable gasses, 200 cubic feet or more Highly Toxic material Radioactive material Corrosive - Inside, over 55 gallons Corrosive, Outside, over 1 gallon (combine) Flammable - Inside, over 1 gallon Flammable, Outside, 60 gallons or more (combine) Oxidizer - 50 gallons or more (combine) Class I Liquids - Inside, more than 5 gallons Class I Liquids - Outside, more than 10 gallons Storage or use of paints, oils, varnishes, or similar mixtures for maintenance, painting or similar purposes for less than 30 days Class II or II-A Liquids - Inside, more than 25 gallons Class II or III-A Liquids - Outside, more than 60 gallons City of Alameda Master Fee Schedule Fire 25 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES Installation, Construction, Alteration or Operation where flammable or combustible liquids are produced, processed, transported, stored, dispensed or used in any of the following: $282 Distilleries Motor Vehicle Fuel-Dispensing Stations Repair Garages Spraying or Dipping High Piled Combustible Storage - Initial inspection $1,155 High Piled Combustible Storage - Annual Permit & inspection $451[1] Fire Inspections A Occupancies (Per Hour) (ie assembly places) $183 B Occupancies (Per Hour) - (ie bank, professional office) $91 E Occupancies (Per Hour) - (ie educational) $225 F Occupancies (Per Hour) - (ie Factory) $183 H Occupancies (Per Hour) - (ie High Hazard) $335 I Occupancies (Per Hour) - (ie Institutional) $225 M Occupancies (Per Hour) - (ie market, department or drug store) $183 R-2 Occupancy (Per Hour) (ie Res Permanent 2+) 3-10 units $91 11-20 units $183 each additional 10 units $91 City of Alameda Master Fee Schedule Fire 26 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES S Occupancies (Per Hour) - (ie Storage) $183 U Occupancies (Per Hour) - (ie Accessory; Private Garage, Agriculture building $91 Marinas $761 Re-Inspection (after initial and first reinspection) $169 Licensed Care Facilities Pre-Inspection $56 Licensed Care Facility (7–49) $169 State and County License Mandated Licensed Care Facility (50+) $338 State and County License Mandated FIRE PLAN CHECK Fire Plan Review (Per Hour; minimum 1 hour$113 FIRE INSPECTIONS Tank Install $1,071 Tank Install - Piping only$169 Tank Removal $789 Fire Underground $366 City of Alameda Master Fee Schedule Fire 27 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES Fire Hydrants $197 Each Additional Hydrant$28 Standpipes $366 Standpipes - Each additional outlet$28 Suppression System - Hood$254 Suppression System - Agents$338 Certificate of Occupancy - Fire Inspection$113 Bldg Insp performed by Fire - all Commercial, R-2$113 Special Permits Burn and Weld (routine welding operation)$169 Film Permit $338 Fireworks $479 Fumigation and Storage$169 Carnivals, Fairs & Special Events$479 Tent Permits 201 to 400 square feet$56 401 to 1500 square feet$85 1501 - 4,500 square feet$169 4501 - 15,000 square feet$169 City of Alameda Master Fee Schedule Fire 28 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES 15,001 - 30,000 square feet$338 > 30,000 square feet$507 Automatic Fire Sprinkler: Inspections/New Systems 0-5,000 s.f.$845 5,001-15,000 s.f.$761 15,001-30,000 s.f.$887 > 30,001 s.f. (each additional 10k s.f.)$366 Repairs/Alterations to existing system 0-5,000 s.f.$634 5,001-15,000 s.f.$761 15,001-30,000 s.f.$887 > 30,001 s.f. (each additional 10k s.f.)$366 Fire Alarm Systems: Inspections/New Systems 0 - 5,000 s.f.$676 5,001 - 15,000 s.f.$930 15,001 - 30,000 s.f.$1,014 > 30,0001 s.f. (each additional 10K s.f.)$507 Repair/Alterations to existing Fire Alarm Systems: City of Alameda Master Fee Schedule Fire 29 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES 0 - 5,000 s.f.$338 5,001 - 15,000 s.f.$380 15,001 - 30,000 s.f.$507 > 30,0001 s.f. (each additional 10K s.f.)$225 Fire False Alarms Fire False Alarm Response [Placeholder for MFS; not analyzed as part of the Scope] Engine Company (1) Engine Company (2) Excessive or malicious residential false alarms causing response of fire apparatus (per 6 months) [Placeholder for MFS; not analyzed as part of the Scope] First Alarm 2nd alarm 3rd alarm 4th alarm Each additional alarm Copy Service - per page (placeholder for MFS - not analyzed as part of this scope) [Placeholder for MFS; not analyzed as part of the Scope] Fire Department Equipment Costs: [Placeholder for MFS; not analyzed as part of the Scope] Fire Equipment Fire Engine - per hour Quint/Ladder Truck - per hour City of Alameda Master Fee Schedule Fire 30 of 31 CITY OF ALAMEDA Schedule of Fire Department Fees Service Fee FIRE DEPARTMENT FEES Paramedic Ambulance - per hour Fire Boat Administration Vehicle - per hour HOURLY RATEs Fire Hourly Rate $113 Engine Co (3 Person Crew)$338 For services requested of City staff which have no fee listed in this fee schedule, the City Manager of the City Manager's designee shall determine the appropriate fee based on the established hourly rates for this division. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application. Notes [1] New Fee [2] Permit Center hourly rate calculated from Permit Center sheet City of Alameda Master Fee Schedule Fire 31 of 31 I, the undersigned, hereby certify that the foregoing Resolution was d uly and regularly adopted and passed by the Council of the City of Alameda in a regular meeting assembled on the 5th day of November, 2013, by the following vote to wit: AYES: Councilmembers Chen, Daysog, Ezzy Ashcraft, Tam and Mayor Gilmore – 5. NOES: None. ABSENT: None. ABSTENTIONS: None. IN WITNESS, WHEREOF, I have hereunto set my hand and affixed the seal of said City this 6th day of November, 2013. _________________________ Lara Weisiger, City Clerk City of Alameda