Loading...
Ordinance 2919CITY OF ALAMEDA ORDINANCE NO. 2919 New Series AMENDING THE ALAMEDA MUICIPAL CODE BY ADDING A NEW SUBSECTION 2-61.8 (DESIGN BUILD) TO SECTION 2-61 (BIDDING PROCEDURS ON PUBLIC PROJECTS AN GOODS AN SUPPLIES) OF CHAPTER II (ADMINISTRATION) BE IT ORDAIND by the City Council of the City of Alameda that: Section 1 . The Alameda Municipal Code is hereby amended by adding a new subsection 2-61.8 (Design Build) to section 2-61 (Bidding Procedures on Public Projects and Goods and Supplies), of Chapter II (Administration) thereof to read: 61.8 Design Build a. This section provides for an alternative and optional procedure on bidding on certain building constrction projects. b. The City Council may authorize use of a design-build contract for projects estimated to cost one million dollars ($1 000 000) or more when it is anticipated that this contracting method wil reduce project cost, expedite project completion, or provide design features not achievable through the design-bid-build method. The city may award a design-build contract based on either the low responsible bid or Best Value. As used in this section: 1. Best value means a value determined by objective criteria and may include but is not limited to , price, features , fuctions , life-cycle costs , and other specified criteria. 2. "Design"'build" means a procurement process in which both the design and construction of a project are procured trom a single entity. Design-build projects shall progress as follows: 1. The city shall prepare a set of documents setting forth the scope of the project in suffcient detail to describe the city s needs and minimum requirements. 2. Based on the documents prepared in paragraph (1), the city shall prepare a request for proposals that invites interested parties to submit competitive sealed proposals in the manner prescribed by the city. 3. The city shall prequalify design-build entities and may use the standard questionnaire developed by the Deparment of Industrial Relations. 4. The city shall establish a procedure for final selection of the design-build entity. Selection may be based on a competitive bidding process resulting in lump-sum bids by the prequalified design-build entities , with the contract to be awarded to the lowest responsible bidder. In the alternative, selection may be based upon a design-build competition based upon Best Value and other criteria set forth in the Request for Proposals upon four (4) affirmative votes of the City Council per City Charter section 3- 15. e. The City Manager or his/her designee is authorized to develop and implement appropriate rules and regulations necessary to carr out the intent of this Chapter. At a minimum , the rules and regulations wil address the following issues: information to be included in design-build Requests for Proposals , procedures for evaluating design-build proposals and awarding design-build contracts , bonding and insurance requirements for design-build contractors , and subcontractor listing requirements for design-build proposals. Section 2 . This Ordinance shall be in full force and effect from and after the expiration of thirty (30) days from the dSttei :::/ it si: 1 al passf:e. ('. - ..-'. ' /."" \\ / A ' \\ '\ .. 15eSlding Of er pnfie/y Council "'= Attest: Lara Weisiger, City City of Alameda , the undersigned , hereby certify that the foregoing Ordinance was duly and regularly adopted and passed by the Council of the City of Alameda in a regular meeting assembled on the 6 day of April , 2004 by the following vote to wit: AYES:Councilmembers Daysog, Gilmore , Kerr , Matarese , and Mayor Jolmson - 5. NOES:None. ABSENT:None. ABSTENTIONS:None. IN WITNESS , WHEREOF , I have hereunto set my hand and affixed the official seal of said City this th day of April , 2004. Lara Weisiger, City City of Alameda